Введение
DROPS 234-46
winterlinesshawl
DROPS design: Pattern me-254
Yarn group B
SIZE
Height: Measured along the middle = approx. 48 cm
Width: Measured along the top side from side to side = approx. 144 cm.
MATERIALS
DROPS MERINO EXTRA FINE from Garnstudio (belongs to yarn group B)
300 g colour 08, light beige
Or use:
DROPS DAISY from Garnstudio (belongs to yarn group B)
300 g colour 02, marzipan
Materials & Sizes
NEEDLES
DROPS CIRCULAR NEEDLE SIZE 4 mm: Length: 80 cm
DROPS CABLE NEEDLE.
KNITTING TENSION
21 stitches in width and 28 rows vertically in stocking stitch = 10 x 10 cm.
21 stitches in width and 42 rows vertically in garter stitch = 10 x 10 cm.
NOTE! Remember that needle size is only a suggestion. If you have too many stitches on 10 cm switch to larger needles. If you have too few stitches on 10 cm switch to smaller needles.
You might also like...
Women Accessories Big Shawls Shawls Classic Textureshoneycomb relief top down zigzag
Pattern instructions
Keep the screen on while knitting
Tools
EXPLANATION FOR THE PATTERN
GARTER STITCH (back and forth):
Knit all rows.
1 ridge vertically = knit 2 rows.
PATTERN
See diagrams A.1 to A.5. Diagrams show all rows in pattern seen from the right side.
INCREASE TIP-1 (in each side of shawl):
Increase from both right side and wrong side!
Increase 1 stitch by making 1 yarn over inside outermost stitch in each side. On next row knit/purl yarn over depending on pattern (it should make a hole).
INCREASE TIP-2 (the middle of shawl):
All increases are done from the right side.
Increase by making 1 yarn over on each side of stitch with marker.
Work yarn overs as follows – from wrong side:
BEFORE STITCH WITH MARKER
Purl yarn over in back loop of stitch. It should not make a hole.
AFTER STITCH WITH MARKER
Slip yarn over off left needle and put it back on left needle but the opposite way (insert left needle in from behind when slipping it back on needle). Purl yarn over in front loop of stitch. It should not make a hole.
Then work the increased stitches in stocking stitch.
SHAWL - SHORT OVERVIEW OF THE PIECE
Worked back and forth on circular needle, top down. Because of the number of stitch it might be wise to distribute the stitches on several circular needle of the same size when increasing.
SHAWL
Cast on 7 stitches on circular needle size 4 mm with DROPS Merino Extra Fine or DROPS Daisy. Knit 1 row from wrong side. Insert 1 marker in the middle stitch on needle - this is the middle stitch and the middle stitch is worked in stocking stitch until finished measurements.
Then work and increase as follows:
ROW 1 (= right side): 1 stitch in GARTER STITCH - read explanation above, increase 1 stitch - read INCREASE TIP-1, knit until middle stitch, increase 1 stitch on each side of middle stitch - read INCREASE TIP-2, knit until 1 stitch remains, increase 1 stitch - read INCREASE TIP-1, finish with 1 stitch in garter stitch (= 4 stitches increased).
ROW 2 (= wrong side): 1 stitch in garter stitch, increase 1 stitch - remember INCREASE TIP-1, knit until middle stitch (work yarn overs as explained in INCREASE TIP-2), purl middle stitch, knit until 1 stitch remains, increase 1 stitch - remember INCREASE TIP-1, finish with 1 stitch in garter stitch (= 2 stitches increased).
Repeat 1st and 2nd row until piece measures 5 cm in knitting direction = approx. 67 stitches on needle. REMEMBER THE KNITTING TENSION!
OVERVIEW OF NEXT SECTION
Now work pattern according to diagram as explained below - read the section PATTERN below before continuing.
AT THE SAME TIME continue increases the same way as before, i.e. increase 4 stitches from right side and 2 stitches from wrong side the entire piece.
PATTERN
Begin each diagram from right side, after increase at the beginning of row. Work diagram as far as you can until middle stitch, work the increased stitches that do not fit the pattern in stocking stitch/garter stitch until middle stitch.
Increase on each side of middle stitch as before, work the same number of stitches in stocking stitch/garter stitch after middle stitch, begin diagram so that the pattern is symmetrical on each side of middle stitch (A.3A and A.3C will not be quite symmetrical on each side of middle stitch), work diagram until increase at the end of row.
Work the increased stitches in stocking stitch, work the edge stitch in each side in garter stitch and work the middle stitch in stocking stitch. Follow the order of diagrams as explained below.
Work A.1 as explained above until piece measures 15 cm in knitting direction and next row is from right side. There are now approx. 151 stitches on needle.
Work A.2 as explained above. When A.2 has been worked, there are approx. 181 stitches on needle and next row is worked from right side.
Work A.3 as explained above (i.e. work A.3A, work A.3B 10 times in total, A.3C and work any remaining stitches before middle stitch in stocking stitch - after middle stitch work the same number of stitches in stocking stitch as before middle stitch, then work pattern the same way, i.e. A.3A, A.3B 10 times in total, A.3C).
When A.3 has been worked, there are approx. 235 stitches on needle and next row is worked from right side.
Work A.4 as explained above - at the same time on next to last row increase 36 stitches evenly (18 stitches on each side of middle stitch). When A.4 has been worked, there are approx. 325 stitches on needle and next row is worked from right side.
Work A.5 as explained above. Work A.5 2 times in total vertically. After A.5 there are approx. 373 stitches on needle and next row is worked from right side.
Work 2 rows in stocking stitch with increases as before and 1 stitch in garter stitch in each side as before - at the same time on first row (right side) decrease 36 stitches evenly (18 stitches on each side of middle stitch) = approx. 343 stitches on needle and next row is worked from right side.
Then work 7 ridges in garter stitch back and forth (work middle stitch in stocking stitch), and increase the same way as before. After last row from wrong side there are approx. 385 stitches on needle.
Shawl measures approx. 38 cm in knitting direction. Cast off somewhat loosely by knitting from the right side.
Diagram
= knit from the right side, purl from the wrong side
= purl from the right side, knit from the wrong side
= between 2 stitches make 1 yarn over, on next row purl yarn over in back loop of stitch to avoid a hole (stitch is twisted towards the left seen from right side)
= between 2 stitches make 1 yarn over, on next row slip yarn over off left needle, put it back on left needle but the opposite way (insert left needle from behind when slipping it back on needle). Purl yarn over in front loop of stitch to avoid a hole (stitch is twisted towards the right seen from right side)
= knit 2 together
= slip 1 stitch knitwise, knit 1, pass slipped stitch over stitch worked
= slip 1 stitch on cable needle behind piece, knit 1, knit 1 from cable needle
= slip 1 stitch on cable needle in front of piece, knit 1, knit 1 from cable needle
= slip 1 stitch knitwise, knit 2 stitches together, pass slipped stitch over stitches worked together