Yarnia
Log in

Sweet Ivy

stephanieclay80
29
Sweet Ivy

JUMPER – SHORT OVERVIEW OF THE PIECE

The piece is first worked back and forth from mid-back and top down. When the split is finished, it is continued in the round. The yoke is divided for the body and sleeves and the body continued in the round. The sleeves are worked in the round with double pointed needles.

NECK

Cast on 73-77-81-85 (89-93-97) stitches with circular needle size 2.5 mm and DROPS Safran. Work 2 RIDGES back and forth – read description above. Change to circular needle size 3 mm.

YOKE

READ THE NEXT SECTION BEFORE CONTINUING!
The first row is worked as follows from the right side:
3 band stitches in garter stitch, 11-12-13-14 (15-16-17) stitches in stocking stitch (half back piece), 1 yarn over, 2 stitches in stocking stitch (raglan-line), 1 yarn over, 6 stitches in stocking stitch and increase 4 stitches evenly over these stitches (10 stitches on the sleeve), 1 yarn over, 2 stitches in stocking stitch (raglan-line), 1 yarn over, 0-0-0-1 (2-3-4) stitches in stocking stitch, A.1 = 25-27-29-29 (29-29-29) stitches – see the start for your size in the smaller sizes, 0-0-0-1 (2-3-4) stitches in stocking stitch (= front piece), 1 yarn over, 2 stitches in stocking stitch (= raglan-line), 1 yarn over, 6 stitches in stocking stitch and increase 4 stitches evenly over these stitches (10 stitches on the sleeve), 1 yarn over, 2 stitches in stocking stitch (raglan-line), 1 yarn over, 11-12-13-14 (15-16-17) stitches in stocking stitch and 3 band stitches in garter stitch (half back piece).
The first increase to RAGLAN – read description above, is now finished and there are 89-93-97-101 (105-109-113) stitches on the row.
Continue with stocking stitch, A.1 and 3 band stitches in garter stitch on each side and continue to increase to raglan every 2nd row (each row from the right side) – REMEMBER THE KNITTING TENSION and the BUTTONHOLES – read description above.
Increase like this every 2nd row (each row from the right side).
The increased stitches are worked in stocking stitch. NOTE! In sizes 0/1 and 1/3 months first work the new stitches into A.1 then in stocking stitch.
AT THE SAME TIME when the piece measures 6 cm join the piece on the next row from the right side as follows:
Cast off the first 3 stitches and work to the end of the row. When the row is finished, continue in the round. You now are working stocking stitch on the back piece, stocking stitch and A.1 on the front piece.
Move the beginning of the round to mid-back.
Increase to raglan a total of 10-12-13-14 (15-16-18) times = 158-178-190-202 (214-226-246) stitches. Continue without further increases until the piece measures 9-10-11-12 (13-14-15) cm.
Work the next round as follows: Work the first 24-27-29-31 (33-35-38) stitches, place the next 32-36-38-40 (42-44-48) stitches on a thread for the sleeve, cast on 6-6-6-8 (8-8-8) stitches (in side under sleeve), work 47-53-57-61 (65-69-75) stitches (front piece), place the next 32-36-38-40 (42-44-48) stitches on a thread for the sleeve, cast on 6-6-6-8 (8-8-8) stitches (in side under sleeve), work the last 23-26-28-30 (32-34-37) stitches.
The body and sleeves are finished separately.

BODY

= 106-118-126-138 (146-154-166) stitches. Insert 1 marker in each side, in the middle of the new stitches cast on under each sleeve.
When the piece measures 3 cm from the division, increase 1 stitch on each side of both markers - read INCREASE TIP.
Increase like this every 2 cm a total of 3-3-3-4 (4-4-4) times = 118-130-138-154 (162-170-182) stitches.
When the piece measures 8-10-11-13 (15-18-21) cm from the division, work 2 ridges over all stitches. Knit 1 round where you increase 18-23-32-33 (42-34-39) stitches evenly spaced = 136-153-170-187 (204-204-221) stitches. Knit 1 round; the yarn overs are knitted twisted to avoid holes.
Now work A.2 over all stitches. When A.2 has been completed in height, loosely cast off.
The jumper measures approx. 25-28-30-33 (36-40-44) cm from the shoulder down.

SLEEVES

Place the 32-36-38-40 (42-44-48) stitches from the thread on the one side of the piece on double pointed needles size 3 mm and knit up 1 stitch in each of the 6-6-6-8 (8-8-8) stitches cast on under the sleeve = 38-42-44-48 (50-52-56) stitches. Insert a marker in the middle of the new stitches under the sleeve. Work stocking stitch in the round.
When the sleeve measures 3 cm from the division, decrease 1 stitch on each side of the marker - read DECREASE TIP!
Decrease like this every 5-4-3-3 (4-5-3½) cm a total of 2-3-4-5 (5-5-7) times = 34-36-36-38 (40-42-42) stitches.
When the sleeve measures 11-14-15-18 (21-26-29) cm, change to double pointed needles size 2.5 mm. Work 2 ridges over all stitches. Cast off with knit. Work the other sleeve in the same way.

ASSEMBLY

Sew the buttons onto the band without buttonholes.
Lay the button-band under the buttonhole-band and sew together at the bottom.

This pattern has been corrected. Click here to see the correction/s.

Diagram
= knit from right side, purl from wrong side
= purl from right side, knit from wrong side
= between 2 stitches make 1 yarn over
= knit 2 together
= slip 1 stitch as if to knit, knit 1 and pass the slipped stitch over the knitted stitch
= slip 1 stitch as if to knit, knit 2 and pass the slipped stitch over the knitted stitches
= this square has no stitch; go straight to the next symbol in the diagram

Beginner Knitting Бесплатно

Suitable yarn

Детский хлопок
2 — Sport (sport weight) 250–400 m Мерсеризованный хлопок 100%

Пехорка

Детский хлопок

100% мерсеризованный хлопок для детских изделий.

330 m/100g 100 g
Летняя
2 — Sport (sport weight) 250–400 m Мерсеризованный хлопок 100%

Пехорка

Летняя

Тонкий мерсеризованный хлопок для летних изделий.

330 m/100g 100 g
Меринго
2 — Sport (sport weight) 250–400 m 50% мериносовая шерсть, 50% акрил

Камтекс

Меринго

Классическая полушерстяная пряжа на мериносе.

380 m/100g 100 g
Хлопок мерсеризованный
2 — Sport (sport weight) 250–400 m 100% мерсеризованный хлопок

Камтекс

Хлопок мерсеризованный

100% мерсеризованный хлопок с гладкой блестящей поверхностью.

200 m/100g 50 g
Organic Cotton
2 — Sport (sport weight) 250–400 m 100% органический хлопок

Gazzal

Organic Cotton

Экологически чистый хлопок с матовой текстурой, идеален для летней одежды и игрушек.

230 m/100g 50 g
Sal Abiye
2 — Sport (sport weight) 250–400 m 80% акрил, 10% полиэстер, 5% …

Alize

Sal Abiye

Нарядная пряжа с пайетками и люрексом для создания вечерних аксессуаров и шалей.

410 m/100g 100 g

Similar tutorials

Strobile
Advanced Knitting

Strobile

Strobile Jumper Strobile The forms of nature will never cease to amaze. The most common cone fascinates with its symmetry…

IBIZA shirt
Intermediate Knitting

IBIZA shirt

Step-by-step knitting instructions The model is presented in three sizes: 1 (42–44), 2 (46–50), and 3 (52–54). The chest circumference…

CLEVER Mittens
Intermediate Knitting

CLEVER Mittens

Necessary tools and materials For the work you will need 60–70 grams of yarn with a yardage of 70–100 meters…

Namaste Yoga Socks (Novita Nalle)
Intermediate Knitting

Namaste Yoga Socks (Novita Nalle)

Namaste Yoga socks (Novita Nalle) Using the smaller needles cast on 54 sts and divide them across four needles. Work…

Suggest a tutorial

Want to see a tutorial on a specific topic? Tell us, and we'll try to prepare it!

We'll send a notification to this address when the tutorial is ready