Введение
DROPS 180-5
sagedreamshawl
DROPS design: Pattern bs-125
Yarn group A
Measurements: Height in the middle: approx. 72 cm Width: approx. 144 cm
Materials:
DROPS BABYALPACA SILK from Garnstudio (belongs to yarn group A)
250 g colour 7820, green
Piece can also be knitted with yarn from:
“Alternative yarn (yarn group A)” - see link below.
DROPS CIRCULAR NEEDLE (80 cm) SIZE 3 mm – or size needed to get 24 stitches and 32 rows in stocking stitch = width 10 cm and 10 cm vertically.
You might also like...
Women Accessories Big Shawls Shawlslace leaf pattern top down
Pattern instructions
Keep the screen on while knitting
Tools
INFORMATION FOR PATTERN
GARTER STITCH (back and forth):
1 ridge = knit 2 rows.
PATTERN
See diagrams A.1 to A.8. Diagrams show all rows in pattern seen from the right side. Row 1 = from right side.
CAST-OFF TIP
To avoid a tight cast-off edge you may use a needle ½ size larger.
SHAWL
Worked back and forth on circular needle, top down.
Cast on 5 stitches on circular needle size 3 mm with BabyAlpaca Silk.
Work pattern according to diagram A.1 - read PATTERN above. When entire diagram A.1 has been worked vertically, there are 17 stitches on row.
WORK DIAGRAM A.2 AS FOLLOWS:
Work 3 edge stitches in GARTER STITCH - see explanation above, A.2 over 5 stitches, 1 stitch in stocking stitch (= middle stitch), A.2 over 5 stitches and 3 edge stitches in garter stitch. REMEMBER THE KNITTING TENSION! When diagram has been worked vertically, there are 73 stitches on row.
WORK DIAGRAMS A.3-A.5 AS FOLLOWS:
Work 3 edge stitches in garter stitch, A.3 over 2 stitches, A.4 over 28 stitches (= 2 repetitions of 14 stitches), A.5 over 3 stitches, 1 stitch in stocking stitch (= middle stitch), A.3 over 2 stitches, A.4 over 28 stitches (= 2 repetitions of 14 stitches), A.5 over 3 stitches and 3 edge stitches in garter stitch. When diagrams have been worked vertically, there are 129 stitches on row.
Continue to work according to diagrams with 3 edge stitches in garter stitch in each side (there is room for 1 repetition more of A.4 next to A.3 and A.5). Repeat diagrams like this:
2nd time: A.3, A.4 x 4, A.5, middle stitch, A.3, A.4 x 4, A.5 = 185 stitches.
3rd time: A.3, A.4 x 6, A.5, middle stitch, A.3, A.4 x 6, A.5 = 241 stitches.
4th time: A.3, A.4 x 8, A.5, middle stitch, A.3, A.4 x 8, A.5 = 297 stitches.
Continue like this the same way (i.e. increase 56 stitches every time A.3 to A.5 have been worked vertically) until shawl measures approx. 67 cm measured along middle stitch - adjuster after 1 whole repetition vertically.
WORK DIAGRAMS A.6-A.8 AS FOLLOWS:
Then work next row as follows: 3 edge stitches in garter stitch, A.6 over 2 stitches, repeat A.7 until 3 stitches remain before middle stitch, A.8 over 3 stitches, middle stitch, A.6 over 2 stitches, repeat A.7 until 6 stitches remain on needle, A.8 over 3 stitches and 3 edge stitches in garter stitch. Continue until diagrams have been worked vertically. Work 2 ridges and cast off - read CAST-OFF TIP above.
Diagram
= knit from the right side, purl from the wrong side
= purl from the right side, knit from the wrong side
= knit 2 together
= slip 1 stitch knitwise, knit 1, pass slipped stitch over stitch worked
= between 2 stitches make 1 yarn over, the yarn overs will make holes on next row
= slip 1 stitch knitwise, knit 2 stitches together, pass slipped stitch over stitches worked together