Введение
DROPS 253-39
nordicoakmittens
DROPS Design: Pattern li-184
Yarn group B
Materials & Sizes
SIZES
S/M – M/L
Circumference approx.: 21-23 cm.
Full length approx.: 19-20 cm.
Length of thumb-gusset approx.: 7-7 cm.
Finger-length approx.: 11-12 cm.
YARN
DROPS LIMA from Garnstudio (belongs to yarn group B)
100-100 g colour 9024, almond
100-100 g colour 100, off white
NEEDLES
DROPS DOUBLE POINTED NEEDLES SIZE 3 MM.
KNITTING TENSION
23 stitches in width and 32 rows in height, with Nordic pattern on needle size 3 mm = 10 x 10 cm.
NOTE: Needle size is only a guide. If you get too many stitches on 10 cm, change to a larger needle size. If you get too few stitches on 10 cm, change to a smaller needle size.
You might also like...
Women Accessories Gloves & Mittens Gift Ideas Mittens Nordic Gloves & Mittensbottom up colourwork nordic star stocking stitch
Pattern instructions
Keep the screen on while knitting
Tools
PATTERN
See diagrams A.1 to A.5. Choose diagram for your size.
Diagram A.5 shows the position of the thumb on the right mitten.
MITTENS – SHORT OVERVIEW OF THE PIECE
The piece is worked in the round, bottom up and stitches are increased for the thumb. The increased stitches are placed on a thread and the hand finished in the round. The thumb is worked in the round to finish.
LEFT MITTEN
Cast on 52-56 stitches with double pointed needles size 3 mm and colour off-white DROPS Lima. Work 1 round of rib (knit 2, purl 2). Change to colour almond and continue the rib until the piece measures 5 cm from cast-on edge.
Continue with stocking stitch and pattern A.1 – on the first round in the diagram decrease 4-4 stitches evenly spaced = 48-52 stitches.
When you have worked as far as the grey squares in the diagram, work A.2 across these 3 stitches. Continue working A.1 and A.2 (increasing stitches in A.2). After the last row in A.2, there are 11-13 stitches in A.2 – place these stitches on a thread and cast on 3 stitches behind them = 48-52 stitches on the round. Continue working A.1 across all stitches. When the diagram is finished, there are 8 stitches left. Cut the strand, pull it through the remaining stitches, tighten and fasten well.
THUMB
Place the 11-13 stitches from the thread on double pointed needles size 3 mm. Start the round by picking up 9 stitches at the back of the thumb (pick up 2 stitches on each side and 5 stitches in the 3 cast-on stitches) = 20-22 stitches. Work A.3 until the thumb measures 3½-4 cm (approx. 2 cm left to finished length). Finish according to diagram A.4. There are 4-4 stitches left. Cut the strand, pull it through the remaining stitches, tighten and fasten well. The thumb measures approx. 5½-6 cm from the picked-up stitches.
RIGHT MITTEN
Worked in the same way as the left, but with the thumb on the opposite side – see diagram A.5 which shows the position of the thumb.
Diagram
= colour almond
= colour off white
= between 2 stitches make 1 yarn over, which is worked twisted on next round to avoid a hole
= knit 2 together with colour almond
= slip 1 stitch knit-wise, knit 1 with colour almond, pass slipped stitch over knitted stitch
= slip 2 stitches as if to knit together, knit 1 with colour almond, pass slipped stitches over knitted stitch
= stitch for thumb-gusset