Yarnia
Log in

Mint Halo Sweater

jefferystevens
30
Mint Halo Sweater

Кратко об описании

  • XS
  • S
  • M
  • L
  • XL
  • XXL
  • 3XL
  • 4 mm
  • 21 × 28 / 10 cm
  • 450 g

Введение

DROPS 266-33

minthalosweater

DROPS Design: Pattern cm-158
Yarn group B

Materials & Sizes

SIZES
XS - S - M - L - XL - XXL - XXXL

YARN
DROPS COTTON MERINO from Garnstudio (belongs to yarn group B)
350-350-400-450-500-500-550 g colour 32, Pistachio Ice Cream

Or use:
DROPS BELLE from Garnstudio (belongs to yarn group B)
300-350-350-400-450-500-550 g colour 32, Peppermint

NEEDLES
DROPS CIRCULAR NEEDLE SIZE 4 MM: Length 40 cm and 80 cm.
DROPS CIRCULAR NEEDLE SIZE 3 MM: Length 40 cm and 80 cm.
DROPS DOUBLE POINTED NEEDLES SIZE 4 MM.
DROPS DOUBLE POINTED NEEDLES SIZE 3 MM.
The technique MAGIC LOOP can be used – you then only need 80 cm circular needle in each size.

KNITTING TENSION
21 stitches in width and 28 rows in height with stocking stitch on needle size 4 mm = 10 x 10 cm.
NOTE: Remember, the needle size is only a guide. If you get too many stitches on 10 cm, change to a larger needle size. If you get to few stitches on 10 cm, change to a smaller needle size.

You might also like...
Women Jumpers Tops Basic Jumpers T-shirtsassembly free lace round neck round yoke top down

Pattern instructions
Keep the screen on while knitting
Tools

INCREASE TIP

Increase 1 stitch by making 1 yarn over. On the next round, knit the yarn over twisted to avoid a hole. Then work the new stitch in stocking stitch.

ELEVATION

To make the back of the neck slightly higher when working a round yoke, you can work an elevation at the beginning of the yoke as described here. Skip this section if you do not want an elevation.
Insert 1 marker at the beginning of the round (mid-back). Read KNITTING TIP and work the next 6 rows back and forth as follows:
ROW 1 (right side): Knit to 12-13-14-15-16-17-18 stitches past the marker-thread at the beginning of the round, turn.
ROW 2 (wrong side): Purl 24-26-28-30-32-34-36, turn.
ROW 3 (right side): Knit 36-39-42-45-48-51-54, turn.
ROW 4 (wrong side): Purl 48-52-56-60-64-68-72, turn.
ROW 5 (right side): Knit 60-65-70-75-80-85-90, turn.
ROW 6 (wrong side): Purl 72-78-84-90-96-102-108, turn.
Knit back to the marker-thread mid-back. Continue the yoke as described in the text.

KNITTING TIP

When working short rows, there will be a small hole after each turn. This hole can be closed by tightening the strand or using the technique German Short Rows as follows:
Slip the first stitch purl-wise, take the strand over the right needle and tighten well from the back (2 loops on the needle). These loops are worked together on the next row.

PATTERN
See diagrams A.1 to A.7 (diagram A.7 only applies to sizes XXL and XXXL).

SLEEVE TIP

When knitting up stitches under the sleeve, you can get a small hole in the transition between stitches on the body and sleeve. This hole can be closed by picking up the strand between 2 stitches and working this strand twisted together with the first stitch between body and sleeve.

DECREASE TIP

Decrease 1 stitch on each side of the marker-thread as follows:
Work until there are 3 stitches left before the marker-thread, knit 2 together, knit 2 (marker-thread sits between these 2 stitches), slip 1 stitch knit-wise, knit 1 and pass the slipped stitch over the knitted stitch (2 stitches decreased).

JUMPER – SHORT OVERVIEW OF THE PIECE

The pattern uses both long and short needles; start with the length which fits the number of stitches and change when necessary.
The neck and yoke are worked in the round with circular needle, top down and from mid-back. If you would like an elevation, rows are worked back and forth before finishing the yoke in the round. When the yoke is finished, it is divided for the body and sleeves and the body continued in the round, while the sleeves wait. The sleeves are worked top down, in the round.
If there is a «0» in your chosen size, skip the information and go straight to the next instruction.

NECK

Cast on 104-108-112-116-120-126-130 stitches with circular needle size 3 mm and DROPS Cotton Merino or DROPS Belle – you can use the Italian cast-on method if you wish.
Work rib in the round (knit 1, purl 1) for 3-3-3-3½-3½-4-4 cm.
The round begins mid-back. Insert 1 marker in the middle of the round (mid-front), the piece is now measured from here.

YOKE

Change to circular needle size 4 mm. Knit 1 round and increase 13-18-23-28-33-36-41 stitches evenly spaced – read INCREASE TIP = 117-126-135-144-153-162-171 stitches.
You can now work an ELEVATION at the back – read explanation above.
If you do not want an elevation, continue as follows.

Work stocking stitch. Remember to maintain the knitting tension.
When the yoke measures 2-2-2-2-3-3-3 cm from the marker, increase stitches by working PATTERN – read explanation above, as follows:
A.1:
Work A.1, 13-14-15-16-17-18-19 times on the round = 143-154-165-176-187-198-209 stitches. Work until A.1 is completed in height.
Work stocking stitch until the yoke measures 5-5-5-5-6-6-6 cm from the marker.
A.2:
Work A.2, 13-14-15-16-17-18-19 times on the round = 169-182-195-208-221-234-247 stitches. Work until A.2 is completed in height.
Work stocking stitch until the yoke measures 8-8-8-8-9-9-9 cm from the marker.
A.3:
Work A.3, 13-14-15-16-17-18-19 times on the round = 195-210-225-240-255-270-285 stitches. Work until A.3 is completed in height.
Work stocking stitch until the yoke measures 11-11-11-11-12-12-12 cm from the marker.
A.4:
Work A.4, 13-14-15-16-17-18-19 times on the round = 221-238-255-272-289-306-323 stitches. Work until A.4 is completed in height.
Work stocking stitch until the yoke measures 14-14-14-14-15-15-15 cm from the marker.
A.5:
Work A.5, 13-14-15-16-17-18-19 times on the round = 247-266-285-304-323-342-361 stitches. Work until A.5 is completed in height.
Work stocking stitch until the yoke measures 17-17-17-17-18-18-18 cm from the marker.
A.6:
Work A.6, 13-14-15-16-17-18-19 times on the round = 273-294-315-336-357-378-399 stitches. Work until A.6 is completed in height. The pattern with increases is finished in sizes XS, S, M, L and XL – go to ALL SIZES.
In sizes XXL and XXXL knit until the yoke measures 0-0-0-0-0-21-21 cm from the marker, then work A.7.
A.7:
Work A.7, 0-0-0-0-0-18-19 times on the round = 273-294-315-336-357-414-437 stitches. Work until A.7 is completed in height. Go to ALL SIZES.

ALL SIZES

When the diagrams are finished, continue with stocking stitch. AT THE SAME TIME, on the first round increase 7-10-9-20-27-2-7 stitches evenly spaced = 280-304-324-356-384-416-444 stitches.
Work until the yoke measures 20-20-21-22-23-25-27 cm from the marker.
Now divide for the body and sleeves.

DIVIDE FOR BODY AND SLEEVES

Knit 42-46-50-54-58-64-70 (= half the back piece), place the next 56-60-62-70-76-80-82 stitches on a stitch holder for the sleeves, cast on 8-8-10-10-12-12-14 stitches (mid-under the sleeve), knit 84-92-100-108-116-128-140 (= front piece), place the next 56-60-62-70-76-80-82 stitches on a stitch holder for the sleeves, cast on 8-8-10-10-12-12-14 stitches (mid-under the sleeve), knit the last 42-46-50-54-58-64-70 stitches (= half the back piece). The body and sleeves are finished separately.

BODY

= 184-200-220-236-256-280-308 stitches. Continue with stocking stitch until the piece measures 38-40-42-43-44-46-48 cm from the marker mid-front.
Change to circular needle size 3 mm. Work rib (knit 1, purl 1), AT THE SAME TIME increase 28-32-30-34-38-42-44 stitches evenly on the first round = 212-232-250-270-294-322-352 stitches.
When the rib measures 3-3-3-3-4-4-4 cm, cast off slightly loosely with rib or with Italian cast-off.
The jumper measures approx. 41-43-45-46-48-50-52 cm from the marker mid-front and 46-48-50-52-54-56-58 cm from the shoulder.

SLEEVES

Place the 56-60-62-70-76-80-82 sleeve-stitches from one stitch holder onto circular needle size 4 mm and knit up 1 stitch in each of the 8-8-10-10-12-12-14 stitches cast on under the sleeve – read SLEEVE TIP = 64-68-72-80-88-92-96 stitches. Insert a marker-thread in the middle of the 8-8-10-10-12-12-14 stitches under the sleeve. The round starts by the marker-thread.
Work stocking stitch in the round.
AT THE SAME TIME, when the sleeve measures 2 cm from the division, decrease mid-under the sleeve – read DECREASE TIP as follows: Decrease 2 stitches every 2 cm 3-3-3-2-2-1-0 a total of 2 times = 58-62-66-76-84-90-96 stitches.
Continue working until the sleeve measures 12-13-12-13-11-10-8 cm from the division.
Change to double pointed needles size 3 mm. Work rib (knit 2, purl 2), AT THE SAME TIME increase 8-8-8-10-10-10-12 stitches evenly on the first round = 66-70-74-86-94-100-108 stitches.
When the rib measures 3-3-3-3-4-4-4 cm, cast off slightly loosely with rib or Italian cast-off. The sleeve measures approx. 15-16-15-16-15-14-12 cm from the division.

Diagram
= knit
= between 2 stitches make 1 yarn over which is knitted on next round to leave a hole
= knit 2 together

Beginner Knitting Бесплатно

Suitable yarn

Детский хлопок
2 — Sport (sport weight) 250–400 m Мерсеризованный хлопок 100%

Пехорка

Детский хлопок

≈ 3 skeins

100% мерсеризованный хлопок для детских изделий.

330 m/100g 100 g
Летняя
2 — Sport (sport weight) 250–400 m Мерсеризованный хлопок 100%

Пехорка

Летняя

≈ 3 skeins

Тонкий мерсеризованный хлопок для летних изделий.

330 m/100g 100 g
Меринго
2 — Sport (sport weight) 250–400 m 50% мериносовая шерсть, 50% акрил

Камтекс

Меринго

≈ 3 skeins

Классическая полушерстяная пряжа на мериносе.

380 m/100g 100 g
Хлопок мерсеризованный
2 — Sport (sport weight) 250–400 m 100% мерсеризованный хлопок

Камтекс

Хлопок мерсеризованный

≈ 10 skeins

100% мерсеризованный хлопок с гладкой блестящей поверхностью.

200 m/100g 50 g
Organic Cotton
2 — Sport (sport weight) 250–400 m 100% органический хлопок

Gazzal

Organic Cotton

≈ 9 skeins

Экологически чистый хлопок с матовой текстурой, идеален для летней одежды и игрушек.

230 m/100g 50 g
Sal Abiye
2 — Sport (sport weight) 250–400 m 80% акрил, 10% полиэстер, 5% …

Alize

Sal Abiye

≈ 3 skeins

Нарядная пряжа с пайетками и люрексом для создания вечерних аксессуаров и шалей.

410 m/100g 100 g

Similar tutorials

Strobile
Advanced Knitting

Strobile

Strobile Jumper Strobile The forms of nature will never cease to amaze. The most common cone fascinates with its symmetry…

IBIZA shirt
Intermediate Knitting

IBIZA shirt

Step-by-step knitting instructions The model is presented in three sizes: 1 (42–44), 2 (46–50), and 3 (52–54). The chest circumference…

CLEVER Mittens
Intermediate Knitting

CLEVER Mittens

Necessary tools and materials For the work you will need 60–70 grams of yarn with a yardage of 70–100 meters…

Namaste Yoga Socks (Novita Nalle)
Intermediate Knitting

Namaste Yoga Socks (Novita Nalle)

Namaste Yoga socks (Novita Nalle) Using the smaller needles cast on 54 sts and divide them across four needles. Work…

Suggest a tutorial

Want to see a tutorial on a specific topic? Tell us, and we'll try to prepare it!

We'll send a notification to this address when the tutorial is ready