Yarnia
Log in

First Leaf Jacket

matthewgilbert
29
First Leaf Jacket

START THE PIECE HERE

JACKET – SHORT OVERVIEW OF THE PIECE.
The neck and yoke are worked back and forth with circular needle and top down. The yoke is divided for body and sleeves and the body continued back and forth with circular needle. The sleeves are worked in the round with double pointed needles/short circular needle, top down.

NECK/YOKE

Cast on 100-104-104-108-112-116 stitches (including 5 band stitches on each side) with circular needle size 2.5 mm and DROPS Baby Merino. Purl 1 row from the wrong side, then work as follows from the right side: 5 band stitches in GARTER STITCH – read explanation above, work rib (knit 2, purl 2) until there are 7 stitches left, knit 2 and 5 band stitches in garter stitch. Work this rib for 3 cm. Remember the BUTTONHOLES on the right band – read description above. Insert 1 marker; the yoke is measured from here. On the next row from the right side increase 1 stitch at the beginning of each purled section (= 22-23-23-24-25-26 stitches increased) – read INCREASE TIP= 122-127-127-132-137-142 stitches. Continue the new rib (knit 2, purl 3) with 5 band stitches in garter stitch on each side, until the piece measures 2½-2½-3-3-3-3½ cm from the marker. Increase 1 stitch at the end of each purled section (= 22-23-23-24-25-26 stitches increased) = 144-150-150-156-162-168 stitches. Continue the new rib (knit 2, purl 4) with 5 band stitches in garter stitch on each side until the piece measures 5-5-6-6-6-7 cm from the marker. Knit 1 row from the right side where you adjust the number as described below – read INCREASE/DECREASE TIP. This is done so the 2 knitted stitches in each raglan-line continue over 2 knitted stitches from the rib.

Adjust as follows: Work 5 band stitches in garter stitch, increase 4-0-1-1-2-4/decrease 0-1-0-0-0-0 stitches evenly over the next 18-24-24-24-24-24 stitches, knit 26, increase 0-6-10-4-0-0/decrease 2-0-0-0-0-2 stitches evenly over the next 46-40-40-46-52-58 stitches, knit 26, increase 4-0-1-1-2-4/decrease 0-1-0-0-0-0 stitches evenly over the next 18-24-24-24-24-24 stitches and 5 band stitches in garter stitch. There are 150-154-162-162-166-174 stitches on the needle.

Change to circular needle size 3 mm. Insert 4 markers without working the stitches:
Count 28-29-31-31-32-34 stitches, insert marker 1 (= right front piece).
Count 24 stitches, insert marker 2 (= sleeve).
Count 46-48-52-52-54-58 stitches, insert marker 3 (= back piece)
Count 24 stitches, insert marker 4 (= sleeve).
There are 28-29-31-31-32-34 stitches left after marker 4 (= left front piece).

Continue with stocking stitch and 5 band stitches in garter stitch on each side, AT THE SAME TIME on the first row from the right side start to increase to RAGLAN – read explanation above. Increase every 2nd row (every row from the right side) a total of 15-16-17-18-19-20 times = 270-282-298-306-318-334 stitches. Continue with stocking stitch and garter stitch until the piece measures 15-15-16-17-18-19 cm from the marker on the neck.

Now divide for the body and sleeves: Work 43-45-48-49-51-54 stitches (= front piece), place the next 54-56-58-60-62-64 stitches on a thread (= sleeve), cast on 6-6-6-8-8-8 stitches under the sleeve, work 76-80-86-88-92-98 stitches (= back piece), place the next 54-56-58-60-62-64 stitches on a thread (= sleeve), cast on 6-6-6-8-8-8 stitches under the sleeve, work the last 43-45-48-49-51-54 stitches (= front piece)

BODY

There are now 174-182-194-202-210-222 stitches on the needle. THE PIECE IS NOW MEASURED FROM HERE! Continue with stocking stitch and garter stitch for 16-20-23-25-26-27 cm (or to desired length; there is approx. 3-3-3-4-4-4 cm left to finished length). Work 1 row and increase 18-18-18-22-22-22 stitches evenly spaced = 192-200-212-224-232-244 stitches.
Change to circular needle size 2.5 mm and work as follows from the right side: 5 stitches in garter stitch, rib (knit 2, purl 2) until there are 7 stitches left, knit 2 and 5 stitches in garter stitch. Work this rib for 3-3-3-4-4-4 cm. Loosely cast off with knit over knit and purl over purl – read CASTING-OFF TIP. Cut and fasten the strand. The jacket measures approx. 36-40-44-48-50-52 cm from the shoulder down.

SLEEVES

Place the 54-56-58-60-62-64 stitches from the thread on the one side of the piece on double pointed needles/short circular needle size 3 mm and knit up 1 stitch in each of the 6-6-6-8-8-8 stitches cast on under the sleeve = 60-62-64-68-70-72 stitches. Insert a marker thread in the middle of the 6-6-6-8-8-8 stitches under the sleeve.
Start at the marker thread and work stocking stitch in the round for 3 cm. Now decrease 2 stitches under the sleeve – read DECREASE TIP. Decrease like this every 2-2½-3½-3-4-4 cm a total of 6-7-6-8-7-8 times = 48-48-52-52-56-56 stitches.
Continue working until the sleeve measures 15-21-24-27-31-35 cm from the division.
There is approx. 3-3-3-4-4-4 cm left to finished length; try the jacket on and work to desired length. Knit 1 round where you decrease 4 stitches evenly spaced = 44-44-48-48-52-52 stitches. Change to double pointed needles size 2.5 mm. Work rib (knit 2, purl 2) for 3-3-3-4-4-4 cm. Cast off with knit over knit and purl over purl – remember CASTING-OFF TIP!
The sleeve measures approx. 18-24-27-31-35-39 cm from the division.
Work the other sleeve in the same way.

ASSEMBLY

Sew the buttons onto the left band.

This pattern has been corrected. Click here to see the correction/s.

Diagram

Beginner Knitting Бесплатно

Suitable yarn

Детский хлопок
2 — Sport (sport weight) 250–400 m Мерсеризованный хлопок 100%

Пехорка

Детский хлопок

100% мерсеризованный хлопок для детских изделий.

330 m/100g 100 g
Летняя
2 — Sport (sport weight) 250–400 m Мерсеризованный хлопок 100%

Пехорка

Летняя

Тонкий мерсеризованный хлопок для летних изделий.

330 m/100g 100 g
Меринго
2 — Sport (sport weight) 250–400 m 50% мериносовая шерсть, 50% акрил

Камтекс

Меринго

Классическая полушерстяная пряжа на мериносе.

380 m/100g 100 g
Хлопок мерсеризованный
2 — Sport (sport weight) 250–400 m 100% мерсеризованный хлопок

Камтекс

Хлопок мерсеризованный

100% мерсеризованный хлопок с гладкой блестящей поверхностью.

200 m/100g 50 g
Organic Cotton
2 — Sport (sport weight) 250–400 m 100% органический хлопок

Gazzal

Organic Cotton

Экологически чистый хлопок с матовой текстурой, идеален для летней одежды и игрушек.

230 m/100g 50 g
Sal Abiye
2 — Sport (sport weight) 250–400 m 80% акрил, 10% полиэстер, 5% …

Alize

Sal Abiye

Нарядная пряжа с пайетками и люрексом для создания вечерних аксессуаров и шалей.

410 m/100g 100 g

Similar tutorials

Strobile
Advanced Knitting

Strobile

Strobile Jumper Strobile The forms of nature will never cease to amaze. The most common cone fascinates with its symmetry…

IBIZA shirt
Intermediate Knitting

IBIZA shirt

Step-by-step knitting instructions The model is presented in three sizes: 1 (42–44), 2 (46–50), and 3 (52–54). The chest circumference…

CLEVER Mittens
Intermediate Knitting

CLEVER Mittens

Necessary tools and materials For the work you will need 60–70 grams of yarn with a yardage of 70–100 meters…

Namaste Yoga Socks (Novita Nalle)
Intermediate Knitting

Namaste Yoga Socks (Novita Nalle)

Namaste Yoga socks (Novita Nalle) Using the smaller needles cast on 54 sts and divide them across four needles. Work…

Suggest a tutorial

Want to see a tutorial on a specific topic? Tell us, and we'll try to prepare it!

We'll send a notification to this address when the tutorial is ready