Yarnia
Log in

Delicate Dance Cardigan

andrew_hughes10
30
Delicate Dance Cardigan

Кратко об описании

  • S
  • M
  • L
  • XL
  • XXL
  • 3XL
  • 5.50 mm
  • 15 × 20 / 10 cm
  • 125 g

Введение

DROPS 258-14

delicatedancecardigan

DROPS Design: Pattern as-194
Yarn group C + A

Materials & Sizes

SIZES
S - M - L - XL - XXL - XXXL

YARN
DROPS BRUSHED ALPACA SILK from Garnstudio (belongs to yarn group C)
125-125-125-150-175-175 g colour 01, off white
And use:
DROPS FLORA from Garnstudio (belongs to yarn group A)
150-200-200-200-250-250 g colour 01, off white

NEEDLES
DROPS CIRCULAR NEEDLE SIZE 5.5 MM: Length 40 cm and 80 cm.
DROPS DOUBLE POINTED NEEDLES SIZE 5.5 MM.
The technique MAGIC LOOP can be used – you then only need 80 cm circular needle.

KNITTING TENSION
15 stitches in width and 20 rows in height, with stocking stitch and 1 strand of each quality on needle size 5.5 mm= 10 x 10 cm.
NOTE: Needle size is only a guide. If you get too many stitches on 10 cm, change to a larger needle size. If you get too few stitches on 10 cm, change to a smaller needle size.

You might also like...
Women Jackets & Cardigans Basic Cardigansassembly free raglan stocking stitch top down v-neck

Pattern instructions
Keep the screen on while knitting
Tools

RAGLAN
Increase 1 stitch by working 1 yarn over, which is worked twisted on the next row to avoid a hole.

V-NECK

Increase 1 stitch by working 1 yarn over, which is worked twisted on the next row to avoid a hole.

DECREASE TIP (mid-under sleeves):
Decrease 1 stitch on each side of the marker-thread as follows:
Work until there are 3 stitches left before the marker-thread, knit 2 together, knit 2 (marker-thread sits between these 2 stitches), slip 1 stitch knit-wise, knit 1 and pass the slipped stitch over the knitted stitch.

START THE PIECE HERE

JACKET – SHORT OVERVIEW OF THE PIECE.
The pattern uses both long and short needles; start with the length which fits the number of stitches and change when necessary.
The bands are worked first, then stitches are cast on between them for the yoke, which is worked back and forth, top down and from mid front. When the yoke is finished, it is divided for body and the sleeves. The body is continued back and forth, while the sleeves wait. The sleeves are worked in the round, top down.
Two ties are worked to finish (used to close the jacket).

RIGHT BAND

Cast on 4 stitches with circular needle size 5.5 mm, 1 strand DROPS Brushed Alpaca Silk and 1 strand DROPS Flora (2 strands).

RIGHT SIDE
Purl 2, slip 1 stitch purl-wise with strand in front, knit 1.

WRONG SIDE

Slip 1 stitch purl-wise with strand in front, knit 3.

Repeat these 2 rows until the band measures 19-19-20-20-20-21 cm, finishing after a row from the wrong side. Cut the strand and lay the piece to one side.

LEFT BAND

Cast on 4 stitches with circular needle size 5.5 mm, 1 strand DROPS Brushed Alpaca Silk and 1 strand DROPS Flora (2 strands).

RIGHT SIDE
Slip 1 stitch purl-wise with strand in front, knit 1, purl 2.

WRONG SIDE

Knit 2, slip 1 stitch purl-wise with strand in front, knit 1.
Repeat these 2 rows until the band measures 19-19-20-20-20-21 cm, finishing after a row from the wrong side. Now cast on stitches for the yoke between the bands as described below.

YOKE

Work the left band as before, then cast on 60-60-62-62-64-66 stitches, work the right band as before (from the right side) = 68-68-70-70-72-74 stitches. Purl 1 row from the wrong side with 4 band stitches on each side.

Insert 4 markers without working the stitches as follows: Count 5 stitches (= front piece), insert 1 marker in the next stitch, count 16 stitches (= sleeve), insert 1 marker in the next stitch, count 22-22-24-24-26-28 stitches (= back piece), insert 1 marker in the next stitch, count 16 stitches (= sleeve), insert 1 marker in the next stitch, there are 5 stitches left after the last marker (= front piece).

Work stocking stitch back and forth with 4 band-stitches as before on each side. AT THE SAME TIME increase for both RAGLAN and the V-NECK – read descriptions above. Read both sections below before continuing. Remember to maintain the knitting tension.

V-NECK

Start to increase for the V-neck on the first row from the right side, then every 4th row 10-10-11-11-12-13 times, increasing 1 stitch inside the bands on each side.

RAGLAN

ROW 1 (right side):
Increase on each side of each marker-stitch (8 increased stitches).
ROW 2 (wrong side):
Work stocking stitch and bands as before.
Work ROWS 1 and 2 a total of 3-3-6-7-4-4 times (6-6-12-14-8-8 worked rows).

Then increase as follows:
ROW 1 (right side):
Increase on each side of each marker-stitch (8 increased stitches).
ROW 2 (wrong side):
Work stocking stitch and bands as before.
ROW 3 (right side):
Increase only on the front and back pieces, i.e., before marker-stitches 1 and 3 and after marker-stitches 2 and 4 – do not increase on the sleeves (= 4 increased stitches).
ROW 4 (wrong side):
Work stocking stitch and bands as before.
Work ROWS 1 to 4 a total of 9-10-9-10-13-14 times (= 36-40-36-40-52-56 rows worked; you have increased a total of 9-10-9-10-13-14 times on the sleeves and 18-20-18-20-26-28 times on the front and back pieces).

All increases for raglan and the V-neck are finished. You have increased a total of 12-13-15-17-17-18 times on the sleeves and 21-23-24-27-30-32 times on the front and back pieces. There are 220-232-248-268-284-300 stitches. The yoke measures approx. 21-23-24-27-30-32 cm from the cast-on edge mid-back. Now divide for the body and sleeves.

DIVIDE FOR BODY AND SLEEVES

Work the 4 band stitches as before, then 33-35-37-40-44-47 stocking stitches (= front piece), place the next 40-42-46-50-50-52 stitches on 1 thread for the sleeve, cast on 8-10-12-14-16-18 stitches (under sleeve), work 66-70-74-80-88-94 stocking stitches (= back piece), place the next 40-42-46-50-50-52 stitches on 1 thread for the sleeve, cast on 8-10-12-14-16-18 stitches (under sleeve), work 33-35-37-40-44-47 stocking stitches (= front piece) and the 4 band stitches as before. The body and sleeves are finished separately.

BODY

= 156-168-180-196-216-232 stitches.
Work stocking stitch back and forth with 4 band-stitches as before on each side until the piece measures 46-48-50-52-54-56 cm mid-back. On the last row decrease 1 stitch approx. mid-back = 155-167-179-195-215-231 stitches. Now you work a rolled edge, starting from the right side as follows: Work the band as before, * knit 1, purl 1 * until there are 5 stitches left on the row, knit 1 and 4 band stitches as before. Then work from the wrong side as follows: Work the band as before, * purl 1, knit 1 * until there are 5 stitches left on the row, purl 1 and 4 band stitches as before. Work 4 rows of stocking stitch. Cast off. The jacket measures approx. 49-51-53-55-57-59 cm mid-back and 54-56-58-60-62-64 cm from top of shoulder.

SLEEVES

Place the 40-42-46-50-50-52 sleeve-stitches from one thread on circular needle size 5.5 mm and knit up 1 stitch in each of the 8-10-12-14-16-18 stitches cast on under the sleeve = 48-52-58-64-66-70 stitches. Insert a marker-thread in the middle of the stitches under the sleeve.
Start at the marker-thread and work stocking stitch in the round.
When the sleeve measures 3 cm, decrease 2 stitches under the sleeve – read DECREASE TIP. Decrease like this every 10-8-6-3½-3½-2½ cm a total of 4-5-7-9-9-10 times = 40-42-44-46-48-50 stitches. Continue working until the sleeve measures 40-39-39-37-34-30 cm from the division. There is 3 cm left to finished length. Work 2 rounds of rib (knit 1, purl 1). Knit 4 rounds. Cast off. The sleeve measures approx. 43-42-42-40-37-35 cm.

ASSEMBLY
Sew the bands together mid-back and sew the bands to the neckline.

TIES

Work a tube of 4 stitches, using double pointed needles size 5.5 mm. Cast on 4 stitches with 1 strand of each quality (2 strands). Knit 1 row, then work as follows: * Push all stitches to the right end of the needle without turning, tighten the strand and knit 1 row , work from -* until the tube measures 25 to 30 cm. Cut the strands. Work 1 more tie in the same way. Sew 1 tie onto each side, approx. 2 cm below the last increase for the V-neck. Tie a bow mid-front.

Diagram

Beginner Knitting Бесплатно

Suitable yarn

Секрет успеха
3 — DK (double knitting) 200–250 m Шерсть 100%

Пехорка

Секрет успеха

≈ 3 skeins

100% шерстяная пряжа.

250 m/100g 100 g
Ecopuno
3 — DK (double knitting) 200–250 m 72% хлопок, 17% мериносовая шерсть, …

Lana Grossa

Ecopuno

≈ 7 skeins

Экологичная пряжа из хлопка, мериноса и альпаки. Лёгкая, с интересной текстурой.

215 m/100g 50 g
Dali (Дали)
3 — DK (double knitting) 200–250 m 50% хлопок, 50% вискоза

Семёновская пряжа

Dali (Дали)

≈ 4 skeins

Хлопково-вискозная пряжа для летних изделий.

215 m/100g 100 g
DROPS Cotton Merino
3 — DK (double knitting) 200–250 m 50% шерсть, 50% хлопок

DROPS Design

DROPS Cotton Merino

≈ 7 skeins

Уникальная смесь хлопка и мериноса — тёплая, но дышащая, для демисезонных вещей.

220 m/100g 50 g
3 — DK (double knitting) 200–250 m 75%wool 25%polyamid

Alize

Wooltime

≈ 4 skeins

200 m/100g 100 g
Простая
3 — DK (double knitting) 200–250 m 50% шерсть, 50% акрил

Троицкая камвольная фабрика

Простая

≈ 4 skeins

Экономичная классическая полушерстяная пряжа с твидовыми расцветками.

200 m/100g 100 g

Similar tutorials

Strobile
Advanced Knitting

Strobile

Strobile Jumper Strobile The forms of nature will never cease to amaze. The most common cone fascinates with its symmetry…

IBIZA shirt
Intermediate Knitting

IBIZA shirt

Step-by-step knitting instructions The model is presented in three sizes: 1 (42–44), 2 (46–50), and 3 (52–54). The chest circumference…

CLEVER Mittens
Intermediate Knitting

CLEVER Mittens

Necessary tools and materials For the work you will need 60–70 grams of yarn with a yardage of 70–100 meters…

Namaste Yoga Socks (Novita Nalle)
Intermediate Knitting

Namaste Yoga Socks (Novita Nalle)

Namaste Yoga socks (Novita Nalle) Using the smaller needles cast on 54 sts and divide them across four needles. Work…

Suggest a tutorial

Want to see a tutorial on a specific topic? Tell us, and we'll try to prepare it!

We'll send a notification to this address when the tutorial is ready