Введение
DROPS 253-41
dandelionfieldmittens
DROPS Design: Pattern li-183
Yarn group B
Materials & Sizes
SIZES
S/M–L/XL
Circumference: Approx. 21-23 cm.
Full length: Approx. 23-24 cm.
Hand-length: Approx. 18-19 cm.
Thumb-gusset length: Approx. 7-7 cm.
Length from gusset to finger tip: Approx. 11-12 cm.
YARN
DROPS LIMA from Garnstudio (belongs to yarn group B)
100-100 g colour 2923, goldenrod
50-50 g colour 0100, off white
NEEDLES
DROPS DOUBLE POINTED NEEDLES SIZE 3 MM.
KNITTING TENSION
23 stitches in width and 32 rows in height, with Nordic pattern on needle size 3 mm = 10 x 10 cm.
NOTE: Needle size is only a guide. If you get too many stitches on 10 cm, change to a larger needle size. If you get too few stitches on 10 cm, change to a smaller needle size.
You might also like...
Women Accessories Gloves & Mittens Gift Ideas Mittens Nordic Gloves & Mittenscolourwork nordic stocking stitch
Pattern instructions
Keep the screen on while knitting
Tools
PATTERN
See diagrams A.1 to A.5. Choose diagram for your size (applies to A.2 to A.5)
Diagram A.5 shows positioning of thumb on right mitten.
MITTENS – SHORT OVERVIEW OF THE PIECE
The piece is worked in the round with double pointed needles, from the cuff upwards, increasing stitches for the thumb. When the increases for the thumb are finished the stitches are placed on a thread while the hand is finished. The thumb is worked in the round.
LEFT MITTEN
Cast on 52-56 stitches with double pointed needles size 3 mm and colour goldenrod DROPS Lima. Work rib in the round (knit 2, purl 2) and work coloured stripes according to diagram A.1.
Now continue with stocking stitch and pattern according to A.2 – on the first round in A.2 decrease 4-4 stitches evenly spaced = 48-52 stitches.
When you have worked as far as the grey squares in the diagram, work A.3 over these 3 stitches. Continue working according to diagrams A.2 and A.3 (you increase stitches in A.3). After the last row in A.3, there are 13-15 stitches in A.3 – place these stitches on a thread and cast on 3 stitches behind these stitches = 48-52 stitches. Continue working A.2 over all stitches. When the diagram is finished, there are 8 stitches left. Cut the strand, tack it through the remaining stitches, tighten and fasten well.
THUMB
Place the 13-15 stitches from the thread on double pointed needles size 3 mm. Start the round by knitting up 9 stitches behind the thumb (knit up 2 stitches on each side, 5 stitches in the 3 cast-on stitches) = 22-24 stitches. Work diagram A.4. When the diagram is finished, there are 6-8 stitches left. Cut the strand, tack it through the remaining stitches, tighten and fasten well.
RIGHT MITTEN
Work in the same way as the left mitten but with the thumb on the opposite side – see diagram A.5 which shows where the thumb is positioned in the pattern.
This pattern has been corrected. Click here to see the correction/s.
Diagram
= goldenrod
= off white
= between 2 stitches make 1 yarn over, which is worked twisted on next round to avoid a hole
= knit 2 together with colour goldenrod
= slip 1 stitch knitwise (colour goldenrod), knit 1 with colour goldenrod, pass slipped stitch over knitted stitch
= slip 2 stitches as if to knit together, knit 1 with colour goldenrod, pass slipped stitches over knitted stitch