Введение
DROPS 249-7
daisyfieldssweater
DROPS Design: Pattern e-367
Yarn group A
Materials & Sizes
SIZES
S - M - L - XL - XXL - XXXL
YARN
DROPS SAFRAN from Garnstudio (belongs to yarn group A)
300-350-400-450-450-500 g colour 17, white
Or use:
DROPS BABY MERINO from Garnstudio (belongs to yarn group A)
300-350-350-400-450-450 g colour 01, white
NEEDLES
DROPS CIRCULAR NEEDLE SIZE 3.5 MM: Length 40 cm and 80 cm.
DROPS CIRCULAR NEEDLE SIZE 2.5 MM: Length 40 cm and 80 cm.
DROPS DOUBLE POINTED NEEDLES SIZE 3.5 MM.
DROPS DOUBLE POINTED NEEDLES SIZE 2.5 MM.
The technique MAGIC LOOP can be used – you then only need 80 cm circular needle in each size.
KNITTING TENSION
24 stitches in width and 32 rows in height with stocking stitch = 10 x 10 cm.
NOTE: Needle size is only a guide. If you get too many stitches on 10 cm, change to a larger needle size. If you get too few stitches on 10 cm, change to a smaller needle size.
You might also like...
Women Jumpersassembly free boat neck lace raglan stocking stitch top down
Pattern instructions
Keep the screen on while knitting
Tools
PATTERN
See diagram A.1. Choose pattern for your size.
As you increase for raglan on the sleeves, work the new stitches into the pattern as shown in A.1; i.e., work the stitches in stocking stitch until there is room for a complete pattern repeat. Stitches which do not fit into the pattern are worked in stocking stitch.
INCREASE TIP-1 (evenly spaced):
Increase 1 stitch by making 1 yarn over, which is knitted twisted on the next round to avoid a hole.
INCREASE TIP-2 (sides of body):
Increase 1 stitch on each side of marker-thread as follows:
Work until there are 2 stitches left before the marker-thread, make 1 yarn over, knit 4 (marker thread sits in the middle of these 4 stitches) make 1 yarn over.
On the next round knit the yarn overs twisted to avoid holes. Then work the new stitches in stocking stitch.
RAGLAN
Increase for raglan before/after 2 knitted stitches (called raglan-stitches in text) in each transition between the body and sleeves (marker-thread sits between these 2 stitches).
INCREASE 1 STITCH:
Before marker-thread: Work until there is 1 stitch left before the marker-thread, pick up from the back the strand between 2 stitches, place it on the left needle and knit it (= 1 increased stitch).
After marker-thread: Work to 1 stitch past the marker-thread, pick up from the front the strand between 2 stitches, place it on the left needle and knit it twisted (= 1 increased stitch).
INCREASE 2 STITCHES:
Before marker-thread: Work until there are 2 stitches left before the marker thread, pick up from the back the strand between 2 stitches, place it on the left needle and knit it. Knit 1, pick up from the back the strand between 2 stitches, place it on the left needle and knit it (= 2 increased stitches).
After marker-thread: Work to 1 stitch past the marker-thread, pick up from the front the strand between 2 stitches and knit it twisted. Knit 1, pick up from the front the strand between 2 stitches and knit it twisted (= 2 increased stitches).
DECREASE TIP (for sleeves):
Decrease 1 stitch on each side of the marker-thread as follows: Work until there are 3 stitches left before the marker-thread, knit 2 together, knit 2 (marker-thread sits between these 2 stitches), slip 1 stitch knit-wise, knit 1 and pass the slipped stitch over the knitted stitch.
START THE PIECE HERE
JUMPER – SHORT OVERVIEW OF THE PIECE.
The pattern uses both long and short needles; start with the length which fits the number of stitches and change when necessary.
The neck and yoke are worked in the round with circular needle, top down. When the yoke is finished, it is divided for the body and sleeves. The body is continued in the round, while the sleeves wait. The sleeves are worked in the round, top down.
NECK
Cast on 120-128-136-144-152-160 stitches with circular needle size 2.5 mm and DROPS Safran or DROPS Baby Merino. Work rib as follows: Knit 1, rib (purl 2, knit 2) until there is 1 stitch left, knit 1. Work this rib for 3-3-3-4-4-4 cm. Insert 1 marker in the last round. The yoke is measured from here.
YOKE
Insert 4 marker-threads, without working the stitches as follows: Insert 1 marker-thread at the beginning of the round (= right back shoulder), count 20-20-28-28-28-32 stitches (= sleeve), insert 1 marker-thread before the next stitch, count 40-44-40-44-48-48 stitches (= front piece) insert 1 marker-thread before the next stitch, count 20-20-28-28-28-32 stitches (= sleeve), insert 1 marker-thread before the next stitch, there are 40-44-40-44-48-48 stitches left (= back piece). The marker-threads are between 2 knitted stitches (raglan-stitches) which are always knitted.
Change to circular needle size 3.5 mm. Read INCREASE TIP-1 in explanations above.
Knit 1 raglan-stitch, work stocking stitch and increase 5-5-3-3-3-5 stitches evenly over the next 18-18-26-26-28-30 stitches, knit 2 raglan-stitches, work stocking stitch and increase 8-6-8-6-4-4 stitches evenly over the next 38-42-38-42-46-46 stitches, knit 2 raglan-stitches, work stocking stitch and increase 5-5-3-3-3-5 m stitches evenly over the next 18-18-26-26-26-30 stitches, knit 2 raglan-stitches, work stocking stitch and increase 8-6-8-6-4-4 stitches evenly over the next 38-42-38-42-46-46 stitches, knit 1 raglan-stitch. There are 146-150-158-162-166-178 stitches (48-50-48-50-52-52 stitches between the marker-threads on front/back pieces and 25-25-31-31-31-37 stitches on the sleeves). Knit 1 round.
INFORMATION BEFORE CONTINUING
Continue with stocking stitch on the front/back pieces and PATTERN on the sleeves – read description above, AT THE SAME TIME increase for RAGLAN – read description above. The increases are different on the front/back pieces and on the sleeves.
SIZES S and M:
Knit 1 raglan-stitch, INCREASE 1 STITCH for raglan after the marker-thread – read description above, work A.1, (= sleeve), INCREASE 1 STITCH for raglan before and after the marker-thread, knit until there is 1 stitch left before the next marker-thread (= front piece), INCREASE 1 STITCH for raglan before and after the marker-thread, work A.1 (= sleeve), INCREASE 1 STITCH for raglan before and after the marker-thread, knit until there is 1 stitch left before the next marker-thread, INCREASE 1 STITCH before the marker-thread, knit 1 raglan-stitch (= back piece) = 154-158 stitches.
Continue with stocking stitch and pattern, increasing 1 stitch for raglan on each side of the raglan-stitches every 2nd round.
REMEMBER THE KNITTING TENSION!
When you have increased 22-25 times for raglan the increases are finished on the sleeves. NOTE! When the diagram is finished in height, continue the pattern onwards. Stitches which do not fit a complete repeat on each side are worked in stocking stitch.
Continue increasing on front/back pieces every 2nd round 2-1 more times, a total of 22-25 times on sleeves and 24-26 times on front/back pieces = 330-354 stitches. There are 96-102 stitches on the front/back pieces and 69-75 stitches on each sleeve.
SIZES L, XL, XXL and XXXL:
Knit 1 raglan-stitch, INCREASE 1 STITCH for raglan after the marker-thread – read description above, work A.1 (= sleeve), INCREASE 1 STITCH for raglan before and after the marker-thread, knit until there is 1 stitch left before the next marker-thread (= front piece), INCREASE 1 STITCH for raglan before and after the marker-thread, work A.1 (= sleeve), INCREASE 1 STITCH for raglan before and after the marker-thread, knit until there is 1 stitch left before the next marker-thread, INCREASE 1 STITCH before the marker-thread and knit 1 raglan-stitch (= back piece) = 166-170-174-186 stitches.
REMEMBER THE KNITTING TENSION!
Continue working while increasing differently on the front/back pieces and on the sleeves, read SLEEVE-INCREASES and BODY-INCREASES before continuing!
SLEEVE-INCREASES
Continue increasing 1 stitch for raglan every 2nd round a total of 18-28-27-22 times (including the increases above), then increase 1 stitch every 4th round 6-2-4-7 times. You have increased for raglan a total of 24-30-31-29 times on the sleeves.
NOTE! When the diagram is finished in height, continue the pattern onwards. Stitches which do not fit a complete repeat on each side are worked in stocking stitch.
BODY-INCREASES
On the next round increase 2 stitches for raglan on the front/back pieces – read INCREASE 2 STITCHES in explanations above.
Then INCREASE 1 STITCH for raglan every 2nd round but every 10th-12th-6th-6th round (i.e., every 5th-6th-3rd-3rd increase), INCREASE 2 STITCHES instead of 1 stitch. Work until you have increased a total of 29-30-34-36 times (6-5-11-12 times with 2 increased stitches instead of 1) = 394-422-470-486 stitches. There are 118-120-142-148 stitches on the front/back pieces and 79-91-93-95 stitches on each sleeve = 394-422-470-486 stitches.
ALL SIZES
= 330-354-394-422-470-486 stitches.
Continue working without further increases until the yoke measures 17-18-20-21-23-25 cm from the marker on the neck.
DIVIDE FOR BODY AND SLEEVES
Knit 1 (this stitch belongs to the back piece), place the next 67-73-77-89-91-93 stitches on 1 thread for the sleeve, cast on 8-8-8-10-10-12 stitches (= in side under sleeve), work 98-104-120-122-144-150 stitches in stocking stitch (= front piece), place the next 67-73-77-89-91-93 stitches on 1 thread for the sleeve, cast on 8-8-8-10-10-12 stitches (= in side under sleeve), work the last 97-103-119-121-143-149 stitches in stocking stitch (= back piece). The body and sleeves are finished separately. The piece is now measured from here.
BODY
= 212-224-256-264-308-324 stitches. Insert 1 marker-thread in the middle of the 8-8-8-10-10-12 stitches cast on under each sleeve; these are used when increasing in the sides.
Work stocking stitch in the round for 5 cm. Now increase 1 stitch on each side of both marker-threads – read INCREASE TIP-2. Increase like this every 4½-5-4½-5-5-4½ cm a total of 4 times = 228-240-272-280-324-340 stitches. Work stocking stitch until the body measures 26-27-26-27-27-26 cm from the division.
Change to circular needle size 2.5 mm. Work rib (knit 2, purl 2), AT THE SAME TIME increase 36-40-44-44-52-56 stitches evenly on the first round = 264-280-316-324-376-396 stitches. When the rib measures 3 cm, cast off with rib a little loosely. The jumper measures approx. 51-53-55-57-59-61 cm from the shoulder.
SLEEVES
Place the 67-73-77-89-91-93 sleeve-stitches from the thread on one side of the piece on short circular needle/double pointed needles size 3.5 mm and knit up 1 stitch in each of the 8-8-8-10-10-12 stitches cast on under the sleeve = 75-81-85-99-101-105 stitches. Insert a marker-thread in the middle of the 8-8-8-10-10-12 stitches under the sleeve.
Start at the marker-thread and work pattern in the round, making sure to continue the pattern from the yoke. The new stitches under the sleeve are worked in stocking stitch. When you decrease under the sleeve, adjust the pattern as you go.
When the sleeve measures 2 cm, decrease 2 stitches under the sleeve – read DECREASE TIP. Decrease like this every 4th round a total of 3-5-5-7-7-8 times, then every 8-8-6-3-3-2½ cm 4-4-5-9-9-9 times = 61-63-65-67-69-71 stitches.
Continue working until the sleeve measures 43-42-41-40-38-38 cm – adjust so you have worked at least 1 round without pattern. Change to double pointed needles size 2.5 mm. Work rib (knit 2, purl 2), AT THE SAME TIME increase 3-5-7-5-7-5 stitches evenly on the first round = 64-68-72-72-76-76 stitches. When the rib measures 4 cm, cast off. The sleeve measures approx. 47-46-45-44-42-42 cm.
This pattern has been corrected. Click here to see the correction/s.
Diagram
= knit
= between 2 stitches make 1 yarn over, which is knitted on the next round to leave a hole
= knit 2 together
= slip 1 stitch knit-wise, knit 1, pass slipped stitch over knitted stitch