Yarnia
Log in

Blue Plume Sweater

austin.s6
32
Blue Plume Sweater

Кратко об описании

  • XS
  • S
  • M
  • L
  • XL
  • XXL
  • 3XL
  • 4.50 mm
  • 17 × 22 / 10 cm
  • 300 g

Введение

DROPS 266-20

blueplumesweater

DROPS design: Pattern as-217
Yarn group A + C

SIZE
XS - S - M - L - XL - XXL - XXXL

Materials & Sizes

YARN
DROPS Alpaca from Garnstudio (belongs to yarn group A)
250-250-300-300-350-400-400 g colour 6205, Light Blue
And use:
DROPS Brushed Alpaca Silk from Garnstudio (belongs to yarn group C)
150-150-175-175-200-225-250 g colour no 28, Pacific Blue

NEEDLES
DROPS CIRCULAR NEEDLE SIZE 4.5 mm: Length 40 and 80 cm.
DROPS CIRCULAR NEEDLE SIZE 3.5 mm: Length: 40 cm.
DROPS DOUBLE POINTED NEEDLES SIZE 4.5 mm.
DROPS DOUBLE POINTED NEEDLES SIZE 3.5 mm.
The technique MAGIC LOOP can be used – you then only need circular needle of 80 cm in each size.

KNITTING TENSION
17 stitches in width and 22 rows vertically in stocking stitch and 1 strand of each quality on needle size 4.5 mm = 10 x 10 cm.
18 stitches in width when working wave pattern with 1 strand of each quality on needle size 4.5 mm = 10 cm.
NOTE! Remember that needle size is only a suggestion. If you have too many stitches on 10 cm switch to larger needles. If you have too few stitches on 10 cm switch to smaller needles.

You might also like...
Women Jumpersassembly free european shoulder round neck top down wave pattern

Pattern instructions
Keep the screen on while knitting
Tools

EXPLANATION FOR THE PATTERN

INCREASE TIP-1:
INCREASE 1 STITCH TOWARDS LEFT - from RIGHT SIDE:
Use left needle to pick up yarn between 2 stitches from row below, pick up yarn from the front and knit stitch in stitch loop behind the needle.
INCREASE 1 STITCH TOWARDS THE RIGHT - from RIGHT SIDE:
Use left needle to pick up yarn between 2 stitches from row below, pick up yarn from the back and knit stitch in stitch loop in front of needle.

INCREASE TIP-2:
INCREASE 1 STITCH TOWARDS THE LEFT - from WRONG SIDE:
Use left needle to pick up yarn between 2 stitches from row below, pick up yarn from the back and purl stitch in stitch loop in front of needle.
INCREASE 1 STITCH TOWARDS THE RIGHT - from WRONG SIDE:
Use left needle to pick up yarn between 2 stitches from row below, pick up yarn from the front and purl stitch in stitch loop behind the needle.

KNITTING TIP

When working short rows, there will be a small hole after each turn. This hole can be closed by tightening the strand or using the technique German Short Rows as follows:
Slip the first stitch purl-wise, take the strand over the right needle and tighten well from the back (2 loops on the needle). These loops are worked together on the next row.

DECREASE TIP

Decrease 1 stitch on each side of marker thread as follows:
Work until 3 stitches remain before marker thread, knit 2 together, knit 2 (marker thread is in the middle of these 2 stitches), slip 1 stitch knitwise, knit 1, pass slipped stitch over stitch worked (= 2 stitches decreased).

JUMPER - SHORT OVERVIEW OF THE PIECE

In this pattern needles of different length have been used, begin with fitting length for number of stitches and switch as needed.
First work piece back and forth on circular needle. Begin by casting on stitches in the back of neck. Then work back piece downwards while AT THE SAME TIME increasing in each side of piece until number of stitches for shoulder width is reached. Back piece has a slight diagonal shoulder. Then work down to armholes. Now put back piece a side and work the front piece. Front piece is first worked in 2 parts. Begin by picking up stitches along one shoulder from back piece, work and increase towards the neck. Repeat on the other shoulder.
Put right and left front piece together when increases for neck are done. Then work front piece down to armholes. Now slip front piece and back piece on to same circular needle and work body downwards in the round on circular needle. Pick up stitches for sleeves around the armholes and work sleeves downwards. First work back and forth with short rows to form a sleeve cap, then work sleeves downwards in the round on needle. Finish by picking up stitches around the neck and work a neck edge.
If 0 is given for the chosen size, it means that you skip the information until next information.

BACK PIECE

Work piece back and forth on circular needle. Cast on 30-30-30-38-38-38-38 stitches on circular needle size 4.5 mm with 1 strand DROPS Alpaca and 1 strand DROPS Brushed Alpaca Silk (= 2 strands).
ROW 1 (= wrong side): Purl all stitches.
ROW 2 (= right side): Read INCREASE TIP-1 and knit 3, increase 1 stitch towards the left, work A.1, A.2, A.3, increase 1 stitch towards the right, knit 3.
ROW 3 (= wrong side): Read INCREASE TIP-2 and purl 3, increase 1 stitch towards the left, work A.3, A.2, A.1, increase 1 stitch towards the right, purl 3.
AFTER 3RD ROW:
Work 2nd and 3rd ROW 13-13-13-11-11-11-11 times in total (= 26-26-26-22-22-22-22 rows worked), after last increase there are 82 stitches on needle in all sizes. A.1, A.2 and A.3 are now finished vertically.

The increases are done in XS and S (continue from ALL SIZES).

Continue increases in size M-L-XL-XXL-XXXL on every row as before inside 3 stitches in stocking stitch in each side, AT THE SAME TIME work pattern as follows: 3 stitches in stocking stitch, work A.4 4 times in total, work 3 stitches in stocking stitch. Work the new stitches in stocking stitch.
Increase 0-0-4-4-8-8-13 times in each side (= 0-0-4-4-8-8-13 rows worked), 26-26-30-26-30-30-35 increases have been done in total in each side = 82-82-90-90-98-98-108 stitches on needle. Continue to work from ALL SIZES.

ALL SIZES

Insert 1 marker at the edge in the side. Now measure piece from here! Now work pattern as follows: Work 3-3-7-7-11-11-16 stitches in stocking stitch, work A.4 4 times in total (continue on correct row in size M- L-XL-XXL-XXXL), work 3-3-7-7-11-11-16 stitches in stocking stitch. Remember to follow the knitting tension!
When piece measures 11-12-11-12-10-11-7 cm from marker, begin increase for armholes. Note which row is next row in pattern. It is important that the increases for armholes on front piece begin on the same row so that the pattern continue from the same row when the patterns are put together.

INCREASE FOR ARMHOLES

ROW 1 (= right side): Read INCREASE TIP-1 and knit 3, increase 1 stitch towards the left, work 0-0-4-4-8-8-13 stitches in stocking stitch, work A.4 4 times in total, work 0-0-4-4-8-8-13 stitches in stocking stitch, increase 1 stitch towards the right, knit 3.
ROW 2 (= wrong side): Purl without increasing.
Work 1st and 2nd ROW 4-4-6-6-8-8-12 times in total = 90-90-102-102-114-114-132 stitches on needle.
Piece should measure approx. 15-16-16-17-17-18-18 cm from marker in the side, finish with a row from wrong side. Cut the yarn, slip stitches on a thread or stitch holder, now work left front piece along the left shoulder as explained below.

LEFT FRONT PIECE

Find left shoulder on back piece as follows: Place back piece flat with right side up, place back piece so that stitches on thread/stitch holder is towards you, left side of piece = left shoulder.
Now pick up stitches along left diagonal shoulder on back piece - begin from right side at the neck and pick up stitches out towards the shoulder as follows:
Pick up 1 stitch in every worked row inside outermost stitch, do not pick up in last stitch towards the shoulder = 25-25-29-25-29-29-34 stitches.
All length measurements on front piece are done from pick up edge.
Work as follows from wrong side: Purl 3-3-7-7-11-11-16 stitches, work A.5.
On row with star, increase stitches towards the neck as follows:
ROW 1 (= right side): Remember INCREASE TIP-1 and work the first 3 stitches in A.5, increase 1 towards the left, continue A.5, knit 3-3-7-7-11-11-16.
ROW 2 (= wrong side): Purl all stitches.
Work 1st and 2nd ROW 5 times in total (= 10 rows worked) = 30-30-34-30-34-34-39 stitches (next row is worked from right side).
Cut the yarn, slip stitches on a thread or stitch holder, now work right front piece along the shoulder – read explanation below.

RIGHT FRONT PIECE

Now pick up stitches along left diagonal shoulder on back piece - begin from right side at the shoulder and pick up stitches out towards the neck as follows:
Begin 1 stitch in from outermost worked row, pick up 1 stitch in every worked row inside outermost stitch = 25-25-29-25-29-29-34 stitches.
All length measurements on front piece are done from pick up edge.
Work as follows from wrong side: Work A.6, purl 3-3-7-7-11-11-16.
On row with star, increase stitches towards the neck as follows:
ROW 1 (= right side): Knit 3-3-7-7-11-11-16, work A.6 until 3 stitches remain, increase towards the right, knit 3 (= the last 3 stitches in A.6) - remember INCREASE TIP-1.
ROW 2 (= wrong side): Purl all stitches.
Work 1st and 2nd ROW 5 times in total (= 10 rows worked) = 30-30-34-30-34-34-39 stitches (next row is worked from right side).
Then place the front pieces together as explained below.

FRONT PIECE (right and left part together):
Work first row as follows from right side:
Knit the 30-30-34-30-34-34-39 stitches from right front piece, cast on 22-22-22-30-30-30-30 new stitches for neck, knit the 30-30-34-30-34-34-39 stitches from left front piece = 82-82-90-90-98-98-108 stitches on needle. Purl 1 row over all stitches.
Then work pattern as follows: Work 3-3-7-7-11-11-16 stitches in stocking stitch, work A.4 4 times in total, work 3-3-7-7-11-11-16 stitches in stocking stitch.
Work until piece measures approx. 23-24-25-26-26-27-25 cm from pick-up edge, and next row is the same rows noted on back piece - now begin increases for armholes.

INCREASE FOR ARMHOLES

ROW 1 (= right side): Read INCREASE TIP-1 and knit 3, increase 1 stitch towards the left, work 0-0-4-4-7-7-12 stitches in stocking stitch, work A.4 4 times in total, work 0-0-4-4-7-7-12 stitches in stocking stitch, increase 1 stitch towards the right, knit 3.
ROW 2 (= wrong side): Purl all stitches.
Work 1st and 2nd ROW 4-4-6-6-8-8-12 times in total = 90-90-102-102-114-114-132 stitches on needle.
Piece should measure approx. 27-28-30-31-33-34-36 cm from pick-up edge. Now put front piece and back piece together for body as explained below.

BODY

Work as before over the 90-90-102-102-114-114-132 stitches from front piece, cast on 5-5-12-12-19-19-20 new stitches at the end of this row, work as before over the 90-90-102-102-114-114-132 stitches from back piece, and cast on 5-5-12-12-19-19-20 new stitches at end of row = 190-190-228-228-266-266-304 stitches on needle.
Continue established pattern, i.e. work as shown in A.4. There is room for 10-10-12-12-14-14-16 repetitions of A.4, make sure that pattern continues correctly over stitches from front piece and back piece.
Continue until piece measures 56-58-60-62-64-66-68 cm from cast-on edge mid back. Knit 1 round and purl 1 round before loosely casting off by knitting.

SLEEVES

Sleeve is worked from the armhole and down.
Place piece flat and insert 1 marker at the top of armhole = mid on top shoulder – NOTE: Mid on top shoulder is not the same place as stitches were picked up for front piece but a few cm down on front piece.
Use circular needle size 5 mm and tightly pick up stitches (use a thinner needle if needed).

PICK UP STITCHES AS FOLLOWS

Begin in the middle of the new stitches cast on under sleeve - pick up 71-75-85-89-99-101-107 stitches – adjust to pick up same number of stitches on each side of marker.

SLEEVE CAP

Work pattern as follows: Work 26-28-33-35-40-41-44 stitches in stocking stitch, A.7, 26-28-33-35-40-41-44 stitches in stocking stitch. First work stocking stitch and pattern back and forth with short rows over sleeve cap to get a better shape on sleeve, begin round mid under sleeve and work as follows:
ROW 1 (= right side): Work 4 stitches past A.7 on top of shoulder, turn piece – read KNITTING TIP.
ROW 2 (= wrong side): Work 4 stitches past A.7, turn piece.
ROW 3 (= right side): Work 3-3-3-3-2-2-2 stitches past previous turn, turn piece.
ROW 4 (= wrong side): Work 3-3-3-3-2-2-2 stitches past previous turn, turn piece.
Repeat ROWS 3 and 4.
Work until 12-12-18-18-24-24-28 turns have been done in total (= 6-6-9-9-12-12-14 times in each side and last row is worked from wrong side).

AFTER LAST TURN

The last time 4th row is worked finish row by turning piece, then work from right side until beginning of round (mid under sleeve).
Insert 1 marker thread mid under sleeve, this is used when decreasing stitches under sleeve. Move marker thread upwards when working.

THE SLEEVE ONWARDS

Now work in the round in stocking stitch and A.7 while AT THE SAME TIME decreasing under sleeve, read DECREASE TIP and decrease like this:
When 1 round has been worked, decrease 2 stitches 2-2-3-3-4-4-4 times on every other round, then decrease 2 stitches 8-9-12-13-16-16-18 times every 3½-3-3-3-2-2-1½ cm = 51-53-55-57-59-61-63 stitches on row.
Work until sleeve measures 47-49-48-48-47-48-46 cm from mid on top shoulder.
Switch to double pointed needles size 3.5 mm and work rib (= knit 1/purl 1) while AT THE SAME TIME increasing 9-11-9-11-9-11-13 stitches evenly on 1st round = 60-64-64-68-68-72-76 stitches.
When rib measures 3-3-3-4-4-4-4 cm, work 3 rounds in stocking stitch with double pointed needles size 5 mm before casting off somewhat loosely by knitting (= rolling edge).
Sleeve measures approx. 50-52-51-52-51-52-50 cm from mid on top of shoulder.

NECK EDGE

Use circular needle size 3.5 mm. Begin from right side at one shoulder line and pick up approx. 88 to 108 stitches inside 1 stitch - number of stitches must be divisible by 2. Work rib in the round = knit 1/purl 1 for 2 cm. Switch to circular needle size 5 mm. Work 3 rounds in stocking stitch and loosely cast off by knitting (= rolling edge).

This pattern has been corrected. Click here to see the correction/s.

Diagram
= knit from the right side, purl from the wrong side
= between 2 stitches make 1 yarn over
= knit 2 together

Beginner Knitting Бесплатно

Suitable yarn

Цветное кружево
1 — Fingering (sock weight) 400–600 m Мерсеризованный хлопок 100%

Пехорка

Цветное кружево

≈ 3 skeins

Очень тонкий мерсеризованный хлопок для тонкого ажура.

475 m/100g 50 g
1 — Fingering (sock weight) 400–600 m 75% шерсть (bluefaced leicester), 25% …

West Yorkshire Spinners

Signature 4 Ply

≈ 2 skeins

Премиальная носочная пряжа из блюфейсд лестерской шерсти. Мягкая и прочная.

400 m/100g 100 g
Superlana Tig
1 — Fingering (sock weight) 400–600 m 25% шерсть, 75% акрил

Alize

Superlana Tig

≈ 1 skein

Тонкая версия классической полушерсти, разработанная специально для вязания крючком.

570 m/100g 100 g
Мак 50 г (набор 2 шт)
1 — Fingering (sock weight) 400–600 m 100% хлопок

ПНК им. С. М. Кирова

Мак 50 г (набор 2 шт)

≈ 3 skeins

Подарочный набор из 2 мотков натуральных вязальных ниток «Мак» из 100% хлопка, по 50 г …

450 m/100g 50 g
A-elita (Аэлита)
1 — Fingering (sock weight) 400–600 m 50% шерсть, 50% акрил

Семёновская пряжа

A-elita (Аэлита)

≈ 1 skein

Очень тонкая полушерстяная пряжа для машинного вязания и ажура.

781 m/100g 100 g
Lidiya silver (Лидия сильвер)
1 — Fingering (sock weight) 400–600 m 50% шерсть имп. меринос, 50% …

Семёновская пряжа

Lidiya silver (Лидия сильвер)

≈ 1 skein

Сверхтонкая полушерстяная пряжа с мериносом для машинного вязания.

1613 m/100g 100 g

Similar tutorials

Strobile
Advanced Knitting

Strobile

Strobile Jumper Strobile The forms of nature will never cease to amaze. The most common cone fascinates with its symmetry…

IBIZA shirt
Intermediate Knitting

IBIZA shirt

Step-by-step knitting instructions The model is presented in three sizes: 1 (42–44), 2 (46–50), and 3 (52–54). The chest circumference…

CLEVER Mittens
Intermediate Knitting

CLEVER Mittens

Necessary tools and materials For the work you will need 60–70 grams of yarn with a yardage of 70–100 meters…

Namaste Yoga Socks (Novita Nalle)
Intermediate Knitting

Namaste Yoga Socks (Novita Nalle)

Namaste Yoga socks (Novita Nalle) Using the smaller needles cast on 54 sts and divide them across four needles. Work…

Suggest a tutorial

Want to see a tutorial on a specific topic? Tell us, and we'll try to prepare it!

We'll send a notification to this address when the tutorial is ready