Yarnia
Log in

Barley Twist Sweater

matthewgilbert
30
Barley Twist Sweater

Кратко об описании

  • XS
  • S
  • M
  • L
  • XL
  • XXL
  • 3XL
  • 6 mm
  • 14 × 17 / 10 cm
  • 250 g

Введение

DROPS 267-9

barleytwistsweater

DROPS Design: Pattern ab-181
Yarn group C + A or D

Materials & Sizes

SIZES
XS - S - M - L - XL - XXL - XXXL

YARN
DROPS ALPACA BOUCLÉ from Garnstudio (belongs to yarn group C)
150-200-200-250-250-250-300 g colour 0100, Off White
And use:
DROPS KID-SILK from Garnstudio (belongs to yarn group A)
50-75-75-75-75-100-100 g colour 01, Off White

NEEDLES
DROPS CIRCULAR NEEDLE SIZE 6 MM: Length 40 cm and 80 cm.
DROPS CIRCULAR NEEDLE SIZE 4.5 MM: Length 40 cm and 80 cm.
DROPS DOUBLE POINTED NEEDLES SIZE 6 MM.
DROPS DOUBLE POINTED NEEDLES SIZE 4.5 MM.
DROPS CABLE NEEDLE.
The technique MAGIC LOOP can be used – you then only need 80 cm circular needle in each size.

KNITTING TENSION
14 stitches in width and 17 rows in height with stocking stitch and 1 strand of each quality on needle size 6 mm = 10 x 10 cm.
NOTE: Remember, the needle size is only a guide. If you get too many stitches on 10 cm, change to a larger needle size. If you get to few stitches on 10 cm, change to a smaller needle size.

You might also like...
Women Jumpers Tops T-shirtsassembly free cable european yoke round neck top down

Pattern instructions
Keep the screen on while knitting
Tools

PATTERN

See diagrams A.1 and A.2.
Choose diagram for your size.

INCREASE TIP-1:
INCREASE 1 STITCH TOWARDS LEFT – from RIGHT SIDE:
Use the left needle to pick up the strand between 2 stitches from the row below, pick up the strand from the front and knit through the stitch loop that lies on the back of the needle.
INCREASE 1 STITCH TOWARDS THE RIGHT- from RIGHT SIDE:
Use the left needle to pick up the strand between 2 stitches from the row below, pick up the strand from the back and knit through the stitch loop that lies on the front of the needle.

INCREASE TIP-2:
INCREASE 1 STITCH TOWARDS THE RIGHT- from WRONG SIDE:
Use the left needle to pick up the strand between 2 stitches from the row below, pick up the strand from the back and purl through the stitch loop that lies on the front of the needle.
INCREASE 1 STITCH TOWARDS LEFT – from WRONG SIDE:
Use the left needle to pick up the strand between 2 stitches from the row below, pick up the strand from the front and purl through the stitch loop that lies on the back of the needle.

SLEEVE TIP

When knitting up stitches under the sleeve, you can get a small hole in the transition between stitches on the body and sleeve. This hole can be closed by picking up the strand between 2 stitches and working this strand twisted together with the first stitch between body and sleeve.

DECREASE TIP

Decrease 1 stitch on each side of the marker-thread as follows:
Work until there are 3 stitches left before the marker-thread, knit 2 together, knit 2 (marker-thread sits between these 2 stitches), slip 1 stitch knit-wise, knit 1 and pass the slipped stitch over the knitted stitch (2 stitches decreased).

START THE PIECE HERE

JUMPER – SHORT OVERVIEW OF THE PIECE.
The pattern uses both long and short needles; start with the length which fits the number of stitches and change when necessary. Cables are worked on the front piece and stocking stitch on the rest of the round.
If there is a «0» in your chosen size, skip the information and go straight to the next instruction.
Work according to points 1 – 5.

  1. BACK PIECE:
    Cast on stitches for the back of the neck. Work the back piece back and forth, top down, increasing stitches on each side until the shoulder stitch-count has been achieved. The back piece has slightly diagonal shoulders.

  2. FRONT PIECE:
    Worked in 2 sections (each side of neck). Start by knitting up stitches along one back shoulder, working downwards and increasing for the neckline. Repeat on the other shoulder.

  3. YOKE:
    Place all the stitches on the same circular needle, work first one front piece, knit up stitches for one sleeve along the side of the front piece, work the back piece, knit up stitches for the second sleeve along the side of the second front piece, cast on stitches for the front neckline. The yoke is continued back and forth from mid-front.

  4. INCREASE FOR NECKLINE, BODY AND SLEEVES:
    While continuing the yoke, stitches are increased first for the neckline and sleeves and later for the body and sleeves. After the final increases for the neckline the front pieces are joined and the yoke is continued in the round.

  5. BODY AND SLEEVES:
    When the increases and the yoke are finished, the yoke is divided for the body and sleeves. The body is finished in the round while the sleeves wait. Then the sleeves are worked in the round, top down. Stitches are knitted up around the neckline and the neck is worked to finish in the round.

BACK PIECE

The piece is worked back and forth.
Cast on 24-24-24-26-26-28-28 stitches with circular needle size 6 mm, 1 strand DROPS Alpaca Bouclé and 1 strand DROPS Kid-Silk (2 strands).
ROW 1 (wrong side): Purl.
ROW 2 (right side): Read INCREASE TIP-1. Knit 3, increase 1 stitch towards the left, knit until there are 3 stitches left on the row, increase 1 stitch towards the right, knit 3.
ROW 3 (wrong side): Read INCREASE TIP-2. Purl 3, increase 1 stitch towards the right, purl until there are 3 stitches left on the row, increase 1 stitch towards the left, purl 3.
AFTER ROW 3:
Work ROWS 2 and 3 a total of 7-7-8-8-8-8-9 times (14-14-16-16-16-16-18 rows worked). After the last increase there are 52-52-56-58-58-60-64 stitches. Remember to maintain the knitting tension. Cut the strand and place the stitches on a stitch holder.

RIGHT SHOULDER

Find the right back shoulder as follows: Lay the back piece flat, right side up, with the stitch holder/thread towards you; right-hand side of piece = right shoulder.
Start from the right side by the armhole on the right back shoulder and knit up 1 stitch in each row worked, inside the outermost stitch, as far as the neckline = 14-14-16-16-16-16-18 shoulder-stitches.
Insert 1 marker by the neck. All measurements on the front piece are taken from this marker, measured in the knitting direction.
Work stocking stitch with the first row from the wrong side.
When the piece measures 5-5-6-5-6-8-8 cm, increase for the neckline as follows:
ROW 1 (right side): Knit until there are 3 stitches left on the row, increase 1 stitch towards the right, knit 3 – remember INCREASE TIP-1.
ROW 2 (wrong side): Purl without increasing.
Work ROWS 1 and 2 a total of 3-3-3-4-4-4-4 times (6-6-6-8-8-8-8 rows worked) = 17-17-19-20-20-20-22 stitches.
The piece measures approx. 9-9-10-10-11-13-13 cm from the marker.
Cut the strand, place the stitches on a stitch holder and work the left shoulder.

LEFT SHOULDER

Start from the right side by the neckline on the left back shoulder and knit up 1 stitch in each row worked, inside the outermost stitch as far as the armhole = 14-14-16-16-16-16-18 shoulder-stitches.
Insert 1 marker by the neck. All measurements on the front piece are taken from this marker, measured in the knitting direction.
Work stocking stitch with the first row from the wrong side.
When the piece measures 5-5-6-5-6-8-8 cm, increase for the neckline as follows:
ROW 1 (right side): Remember INCREASE TIP-1. Knit 3, increase 1 stitch towards the left, knit to end of row (1 increased stitch).
ROW 2 (wrong side): Purl without increasing.
Work ROWS 1 and 2 a total of 3-3-3-4-4-4-4 times (6-6-6-8-8-8-8 rows worked) = 17-17-19-20-20-20-22 stitches.
The yoke measures approx. 9-9-10-10-11-13-13 cm from the marker.
The front and back pieces are now joined, stitches are knitted up for the sleeves, the neckline-increases are continued and stitches are increased for the sleeves.

ROW 1 (right side): Start from the right side with the left front piece, knit 3, increase 1 stitch towards the left, knit until there are 2 stitches left on the front piece, slip 1 stitch, knit 1 and pass the slipped stitch over (1 stitch decreased), insert 1 marker here, knit up 12-12-14-14-16-18-18 stitches along the side of the left front piece (= sleeve-stitches, are knitted up inside the outermost stitch), insert 1 marker here, knit the first 2 stitches on the back piece together (1 stitch decreased), knit until there are 2 stitches left on the back piece, slip 1 stitch, knit 1 and pass the slipped stitch over (1 stitch decreased), insert 1 marker here, knit up 12-12-14-14-16-18-18 stitches along the side of the right front piece (= sleeve-stitches, are knitted up inside the outermost stitch), insert 1 marker here, knit together the first 2 stitches on the right front piece (1 stitch decreased) knit until there are 3 stitches left, increase 1 stitch towards the right, knit 3 = 108-108-120-124-128-134-142 stitches. The neckline-increases are finished. The piece measures approx. 10-10-11-11-12-14-14 cm from the marker. Some of the neckline-depth will lie on the back piece. Neckline-depth in front = 9-9-10-10-11-12-12 cm. Neckline-depth at back = 1-1-1-1-1-2-2 cm.
ROW 2 (wrong side): Purl to the first marker, move the marker onto the right needle, increase 1 stitch towards the left, purl to the next marker, increase 1 stitch towards the right, move the marker onto the right needle, purl to the next marker, move the marker onto the right needle, increase 1 stitch towards the left, purl to the next marker, increase 1 stitch towards the right, move the marker onto the right needle, purl to end of row = 112-112-124-128-132-138-146 stitches.
ROW 3 (right side): Knit to the first marker, move the marker onto the right needle, increase 1 stitch towards the left, knit to the next marker, increase 1 stitch towards the right, move the marker onto the right needle, knit to the next marker, move the marker onto the right needle, increase 1 stitch towards the left, knit to the next marker, increase 1 stitch towards the right, move the marker onto the right needle, knit to end of row, then cast on 15-15-15-15-15-17-17 new stitches for the neckline = 131-131-143-147-151-159-167 stitches.
Now continue in the round.

YOKE

Knit to the first marker (end of front piece), the round starts here, i.e., in the transition between the front piece and the left sleeve:
ROUND 1: Move the marker onto the right needle, increase 1 stitch towards the left, knit to the next marker, increase 1 stitch towards the right, move the marker onto the right needle, knit to the next marker (= back piece), move the marker onto the right needle, increase 1 stitch towards the left, knit to the next marker (= right sleeve), increase 1 stitch towards the right, move the marker onto the right needle, knit 12-12-14-13-13-12-14, work A.1 across the next 25-25-25-29-29-33-33 stitches, knit 12-12-14-13-13-12-14 (= front piece) = 135-135-147-151-155-163-171 stitches.
ROUND 2: Move the marker onto the right needle, increase 1 stitch towards the left, knit to the next marker, increase 1 stitch towards the right, move the marker onto the right needle, knit to the next marker, move the marker onto the right needle, increase 1 stitch towards the left, knit to the next marker, increase 1 stitch towards the right, move the marker onto the right needle, continue stocking stitch and A.1 across the front piece = 151-151-163-167-171-183-191 stitches – remember INCREASE TIP-1. The stitch count on the sleeves increases but remains the same on the front and back pieces.
ROUND 3: Knit and work A.1 without increasing.
Work ROUNDS 2 and 3 a total of 7-5-6-6-5-2-2 times (14-10-12-12-10-4-4 rounds worked BUT when A.1 is finished in height work A.2 above A.1 with the other stitches knitted).
A total of 10-8-9-9-8-5-5 increases in height on the sleeves: 32-28-32-32-32-28-28 stitches on the sleeves, 50-50-54-56-56-58-62 stitches on the back piece and 61-61-65-67-67-73-77 stitches on the front piece) = 175-167-183-187-187-187-195 stitches.

You now increase on both the body and sleeves, increasing on the body inside the 2 stocking stitches on the front and back pieces as follows:

ROUND 1: Move the marker onto the right needle, increase 1 stitch towards the left, knit to the next marker, increase 1 stitch towards the right, move the marker onto the right needle, knit 2, increase 1 stitch towards the left, knit until there are 2 stitches left on the back piece, increase 1 stitch towards the right, knit 2, move the marker onto the right needle, increase 1 stitch towards the left, knit to the next marker, increase 1 stitch towards the right, move the marker onto the right needle, knit 2, increase 1 stitch towards the left, knit and continue A.2 until there are 2 stitches left on the front piece, increase 1 stitch towards the right, knit 2 (8 increased stitches: 1 increased stitch on each side of 2 stitches in each transition between the body and sleeves).
ROUND 2: Knit and continue A.2 without increasing.
Work ROUNDS 1 and 2 a total of 3-5-5-6-9-12-12 times (6-10-10-12-18-24-24 rounds worked). A total of 13-13-14-15-17-17-17 increases in height on the sleeves and 3-5-5-6-9-12-12 increases in height on the body: 38-38-42-44-50-52-52 stitches on each sleeve, 56-60-64-68-74-82-86 stitches on the back piece and 67-71-75-79-85-97-101 stitches on the front piece = 199-207-223-235-259-283-291 stitches.

The sleeves measure approx. 14-14-15-16-18-18-18 cm. When the jumper is folded double at the shoulder the piece measures approx. 19-19-20-21-24-25-25 cm from outermost on the shoulder and down the armhole. If the piece is shorter than this, continue working to the correct length without further increases.
Now divide for the body and sleeves.

DIVIDE FOR BODY AND SLEEVES

Place the first 38-38-42-44-50-52-52 stitches on a stitch holder for the sleeve, cast on 6-8-8-10-10-12-14 stitches (mid-under the sleeve), knit 56-60-64-68-74-82-86 (back piece), place the next 38-38-42-44-50-52-52 stitches on a stitch holder for the sleeve, cast on 6-8-8-10-10-12-14 stitches (mid-under the sleeve), work the last 67-71-75-79-85-97-101 stitches in stocking stitch and cables as before (= front piece).
The body and sleeves are finished separately.

BODY

= 135-147-155-167-179-203-215 stitches.
Work stocking stitch in the round, with pattern on the front piece, for a further 21-23-23-25-22-23-24 cm – adjust so you have worked 3 to 5 rounds after the last round of cabling.
Change to circular needle size 4.5 mm. Work rib (knit 1, purl 1), AT THE SAME TIME increase 13-13-15-17-19-21-23 stitches evenly on the first round (4 of these are 1 stitch increased in each section marked with an arrow in A.2, the other 9-9-11-13-15-17-19 stitches evenly spaced = 148-160-170-184-198-224-238 stitches. The rib should fit neatly into the pattern on the front, with the purled stitches in the pattern continuing on the rib.

When the rib measures 4-4-4-4-5-5-5 cm, cast off with rib.
The jumper measures approx. 48-50-52-54-56-58-60 cm from the top of the shoulder.

SLEEVES

Place the 38-38-42-44-50-52-52 sleeve-stitches from one stitch holder onto circular needle size 6 mm and knit up 1 stitch in each of the 6-8-8-10-10-12-14 stitches cast on under the sleeve – read SLEEVE TIP = 44-46-50-54-60-64-66 stitches. Insert a marker-thread in the middle of the 6-8-8-10-10-12-14 stitches under the sleeve. The round starts by the marker-thread.
Work stocking stitch in the round.
AT THE SAME TIME, when the sleeve measures 1 cm from the division, decrease mid-under the sleeve – read DECREASE TIP as follows: Decrease 2 stitches 2-2-3-3-5-5-5 times every 2nd round = 40-42-44-48-50-54-56 stitches.
Continue working until the sleeve measures 10-11-9-9-7-7-7 cm from the division.
Change to double pointed needles size 4.5 mm. Work rib (knit 1, purl 1), AT THE SAME TIME increase 2-4-4-4-4-4-4 stitches evenly on the first round = 42-46-48-52-54-58-60 stitches.
When the rib measures 4-4-4-4-5-5-5 cm, cast off with rib. The sleeve measures approx. 14-15-13-13-12-12-12 cm from the division.

NECK (rib with I-cord cast-off):
Use circular needle size 4.5 mm and 1 strand of each quality (2 strands).
Start from the right side on one shoulder-line and knit up 72-72-74-76-78-88-88 stitches inside 1 stitch around the neckline. Knit 1 round and adjust the stitch count if necessary, it must be divisible by 2. Work rib in the round (knit 1, purl 1) for 3-3-3-3½-3½-4-4 cm. After the last round, cast off as follows:
START (right side):
Cast on 2 stitches onto the right needle from the right side.
Slip these 2 stitches onto the left needle so the working strand is 2 stitches in on the needle (when working, the strand tightens the edge into a small tube).
ROW 1 (right side):
Knit 1, knit the next 2 stitches twisted together. Slip the 2 stitches from the right to the left needle. Do not turn.
Repeat ROW 1 until there are 2 stitches left. Slip the 2 stitches from the right to the left needle. Cast off.
Sew a small stitch to join the beginning and end of the I-cord.

Diagram
= knit
= purl
= between 2 stitches make 1 yarn over. On next round knit yarn over twisted to avoid a hole
= place 3 stitches on cable needle in front of piece, knit 3, knit 3 from cable needle
= place 3 stitches on cable needle behind the piece, knit 3, knit 3 from cable needle
= place 4 stitches on cable needle in front of piece, knit 4, knit 4 from cable needle
= place 4 stitches on cable needle behind the piece, knit 4, knit 4 from cable needle
= increase 1 stitch here (applies when working rib at bottom of body)

Beginner Knitting Бесплатно

Suitable yarn

Секрет успеха
3 — DK (double knitting) 200–250 m Шерсть 100%

Пехорка

Секрет успеха

≈ 3 skeins

100% шерстяная пряжа.

250 m/100g 100 g
Ecopuno
3 — DK (double knitting) 200–250 m 72% хлопок, 17% мериносовая шерсть, …

Lana Grossa

Ecopuno

≈ 7 skeins

Экологичная пряжа из хлопка, мериноса и альпаки. Лёгкая, с интересной текстурой.

215 m/100g 50 g
Dali (Дали)
3 — DK (double knitting) 200–250 m 50% хлопок, 50% вискоза

Семёновская пряжа

Dali (Дали)

≈ 4 skeins

Хлопково-вискозная пряжа для летних изделий.

215 m/100g 100 g
DROPS Cotton Merino
3 — DK (double knitting) 200–250 m 50% шерсть, 50% хлопок

DROPS Design

DROPS Cotton Merino

≈ 7 skeins

Уникальная смесь хлопка и мериноса — тёплая, но дышащая, для демисезонных вещей.

220 m/100g 50 g
3 — DK (double knitting) 200–250 m 75%wool 25%polyamid

Alize

Wooltime

≈ 4 skeins

200 m/100g 100 g
Простая
3 — DK (double knitting) 200–250 m 50% шерсть, 50% акрил

Троицкая камвольная фабрика

Простая

≈ 4 skeins

Экономичная классическая полушерстяная пряжа с твидовыми расцветками.

200 m/100g 100 g

Similar tutorials

Strobile
Advanced Knitting

Strobile

Strobile Jumper Strobile The forms of nature will never cease to amaze. The most common cone fascinates with its symmetry…

IBIZA shirt
Intermediate Knitting

IBIZA shirt

Step-by-step knitting instructions The model is presented in three sizes: 1 (42–44), 2 (46–50), and 3 (52–54). The chest circumference…

CLEVER Mittens
Intermediate Knitting

CLEVER Mittens

Necessary tools and materials For the work you will need 60–70 grams of yarn with a yardage of 70–100 meters…

Namaste Yoga Socks (Novita Nalle)
Intermediate Knitting

Namaste Yoga Socks (Novita Nalle)

Namaste Yoga socks (Novita Nalle) Using the smaller needles cast on 54 sts and divide them across four needles. Work…

Suggest a tutorial

Want to see a tutorial on a specific topic? Tell us, and we'll try to prepare it!

We'll send a notification to this address when the tutorial is ready